Increasing production rate in U-type assembly lines with sequence-dependent set-up times

ABSTRACT U-shaped assembly lines are commonly used in just-in-time production systems as they have some advantages over straight lines. Although maximizing production rates on these lines by assigning tasks to stations is common practice in industrial environments, studies on the stated assembly line balancing problem are limited. This article deals with maximizing the production rate on U-shaped assembly lines under sequence-dependent set-up times. Sequence-dependent set-up times mean that after a task is performed, a set-up time, the duration of which depends on adjacent tasks, is required to start the next task operation. These set-ups are considered by dividing them into two groups, named forward and backward set-ups, to make the problem more practical. Two heuristics based on simulated annealing and genetic algorithms are improved beside the mathematical model. Experimental results show that solving the stated problem using the mathematical model is nearly impossible, while heuristics may obtain solutions that have acceptable deviations from the lower bounds.

[1]  Armin Scholl,et al.  ULINO: Optimally balancing U-shaped JIT assembly lines , 1999 .

[2]  John H. Holland,et al.  Adaptation in Natural and Artificial Systems: An Introductory Analysis with Applications to Biology, Control, and Artificial Intelligence , 1992 .

[3]  Adil Baykasoğlu,et al.  Stochastic U-line balancing using genetic algorithms , 2007 .

[4]  Nils Boysen,et al.  The sequence-dependent assembly line balancing problem , 2008, OR Spectr..

[5]  Mostafa Zandieh,et al.  A simulated annealing algorithm for balancing the assembly line type II problem with sequence-dependent setup times between tasks , 2011 .

[6]  El-Ghazali Talbi,et al.  Metaheuristics - From Design to Implementation , 2009 .

[7]  Harold W. Kuhn,et al.  The Hungarian method for the assignment problem , 1955, 50 Years of Integer Programming.

[8]  Armin Scholl,et al.  State-of-the-art exact and heuristic solution procedures for simple assembly line balancing , 2006, Eur. J. Oper. Res..

[9]  Ihsan Sabuncuoglu,et al.  Balancing of U-type assembly systems using simulated annealing , 2001 .

[10]  Nima Hamta,et al.  A hybrid PSO algorithm for a multi-objective assembly line balancing problem with flexible operation times, sequence-dependent setup times and learning effect , 2013 .

[11]  Emel Kizilkaya Aydogan,et al.  Balancing stochastic U-lines using particle swarm optimization , 2019, J. Intell. Manuf..

[12]  M. Teki̇n,et al.  A mixed integer linear programming formulation for optimal balancing of mixed-model U-lines , 2009 .

[13]  Adil Baykasoğlu,et al.  Modeling and solving mixed-model assembly line balancing problem with setups. Part II: A multiple colony hybrid bees algorithm , 2014 .

[14]  Mohammad Hossein Fazel Zarandi,et al.  Fuzzy adaptive genetic algorithm for multi-objective assembly line balancing problems , 2015, Appl. Soft Comput..

[15]  C. D. Gelatt,et al.  Optimization by Simulated Annealing , 1983, Science.

[16]  Nils Boysen,et al.  The assembly line balancing and scheduling problem with sequence-dependent setup times: problem extension, model formulation and efficient heuristics , 2013 .

[17]  Christodoulos A. Floudas,et al.  Balancing mixed-model assembly lines with sequence-dependent tasks via hybrid genetic algorithm , 2016, J. Glob. Optim..

[18]  Subhash C. Sarin,et al.  A survey of the assembly line balancing procedures , 1998 .

[19]  Brahim Hnich,et al.  Simultaneous Balancing and Scheduling of Flexible Mixed Model Assembly Lines with Sequence-Dependent Setup Times , 2010, Electron. Notes Discret. Math..

[20]  Carlos Andrés,et al.  Balancing and scheduling tasks in assembly lines with sequence-dependent setup times , 2008, Eur. J. Oper. Res..

[21]  Anoop K. Dhingra,et al.  An efficient approach for reliability-based topology optimization , 2016 .

[22]  Metin Turkay,et al.  A novel integer programming formulation with logic cuts for the U-shaped assembly line balancing problem , 2014 .

[23]  Jessica Schulze,et al.  Balancing And Sequencing Of Assembly Lines , 2016 .

[24]  Tianyuan Xiao,et al.  Balancing and sequencing of stochastic mixed-model assembly U-lines to minimise the expectation of work overload time , 2014 .

[25]  Timothy L. Urban,et al.  Note. Optimal Balancing of U-Shaped Assembly Lines , 1998 .

[26]  Uğur Özcan,et al.  Balancing two-sided assembly lines with sequence-dependent setup times , 2010 .

[27]  윤태혁,et al.  (The) U-line line balancing problem with the moving time of operator = U자형 라인에서 작업자 이동시간을 고려한 라인밸런싱에 관한 연구 , 1996 .

[28]  Kanchana Sethanan,et al.  Modified differential evolution algorithm for simple assembly line balancing with a limit on the number of machine types , 2016 .

[29]  Masoud Rabbani,et al.  Mixed model U-line balancing type-1 problem: A new approach , 2012 .

[30]  J. Wijngaard,et al.  The U-line balancing problem , 1994 .

[31]  Adil Baykasoglu,et al.  Hybridizing ant colony optimization via genetic algorithm for mixed-model assembly line balancing problem with sequence dependent setup times between tasks , 2013, Appl. Soft Comput..

[32]  J. Mukund Nilakantan,et al.  Robotic U-shaped assembly line balancing using particle swarm optimization , 2016 .

[33]  Jaideep Motwani,et al.  The effect of straight- and U-shaped lines on quality , 2000, IEEE Trans. Engineering Management.