Developing a data-collection system for PCB assembly: a case study in software engineering

For manufacturing firms to increase productivity and quality while reducing their inventory and operational costs, a simple and easy-to-use data collection system is needed on the shop floor. Such a system developed for an electronic card manufacturing line is discussed. Facility operations are described, and the requirements for an ideal software solution are outlined. An independent development effort was undertaken to satisfy the unique requirements of the production line. As work progressed, a number of factors conspired to produce schedule and cost overruns that caused management to scale back the scope considerably. What eventually emerged was a much leaner and less capable system than originally envisioned. The factors that put the project in jeopardy are discussed, and some suggestions and lessons gained from the experience, which are applicable to any software development project, are offered. >

[1]  David M. Dilts,et al.  The evolution of control architectures for automated manufacturing systems , 1991 .

[2]  Zbigniew H. Przasnyski,et al.  On Information Systems Project Abandonment: An Exploratory Study of Organizational Practices , 1991, MIS Q..

[3]  Patrick Brown,et al.  Managing software development , 1985 .

[4]  Colin L. Moodie,et al.  An intelligent information system for an automated, integrated manufacturing system , 1989 .

[5]  G. Harhalakis,et al.  Development of a factory level CIM model , 1990 .

[6]  Kenneth Fordyce,et al.  IBM Burlington's Logistics Management System , 1990 .

[7]  B. S. Buchowicz,et al.  A process model of make-vs.-buy decision-making. The case of manufacturing software , 1991 .

[8]  D. Wilemon,et al.  A Survey of Major Approaches for Accelerating New Product Development , 1992 .

[9]  M. C. Bonney,et al.  Design of production control systems: Choice of system structure and systems implementation sequence , 1989 .

[10]  Yasuo Mizokami The total CIM system for semiconductor plants , 1990, IEEE/SEMI International Symposium on Semiconductor Manufacturing Science.

[11]  Fred P. Brooks,et al.  The Mythical Man-Month , 1975, Reliable Software.

[12]  R. B. Rowen,et al.  Software project management under incomplete and ambiguous specifications , 1990 .

[13]  Michiel van Genuchten,et al.  Why is Software Late? An Empirical Study of Reasons For Delay in Software Development , 1991, IEEE Trans. Software Eng..

[14]  S. Vajpayee,et al.  Recent developments in computer hardware and their effect on computer-integrated manufacturing , 1990 .

[15]  K. Voigt,et al.  ReDS—A dynamic planning, scheduling, and control system for manufacturing , 1990 .

[16]  Barry W. Boehm,et al.  A spiral model of software development and enhancement , 1986, Computer.

[17]  Ellis Horowitz,et al.  A Formal Model for Software Project Management , 1989, IEEE Transactions on Software Engineering.

[18]  Gerhard Plenert Developing a Production System in Mexico , 1990 .