Numerical algorithm of reinforced concrete lining cracking process for pressure tunnels
暂无分享,去创建一个
Wei Zhang | Cuiying Zhou | Zhen Liu | Cuiying Zhou | Zhen Liu | Wei Zhang | B. Dai | Beibing Dai
[1] Krishna Kanta Panthi,et al. Norwegian Design Principle for High Pressure Tunnels and Shafts: Its Applicability in the Himalaya , 2014 .
[2] Jian Liu,et al. Cause investigation and verification of lining cracking of bifurcation tunnel at Huizhou Pumped Storage Power Station , 2016 .
[3] Günter Hofstetter,et al. Numerical simulation of the load-carrying behavior of RC tunnel structures exposed to fire , 2009 .
[4] Kai Su,et al. Hydro-mechanical interaction analysis of high pressure hydraulic tunnel , 2015 .
[5] Tinh Quoc Bui,et al. A fictitious crack XFEM with two new solution algorithms for cohesive crack growth modeling in concrete structures , 2015 .
[6] F. Jeng,et al. The deformation of overburden soil induced by thrust faulting and its impact on underground tunnels , 2007 .
[7] Anton Schleiss,et al. Design of reinforced concrete linings of pressure tunnels and shafts , 1997 .
[8] Busari Afis Olumide,et al. A Finite Element Model for Optimum Design of Plain Concrete Pressure Tunnels under High Internal Pressure , 2012 .
[9] Giancarlo Gioda,et al. Investigation on the Cause of Damages of a Deep Tunnel , 2012 .
[10] Cuiying Zhou,et al. A pore-scale numerical model for non-Darcy fluid flow through rough-walled fractures , 2017 .
[11] G. Seeber. Power conduits for high-head plants. Part one. , 1985 .
[12] Anton Schleiss. Design of concrete linings of pressure tunnels and shafts for external water pressure , 1997 .
[13] M. Marence,et al. Mechanical-hydraulic interaction in the lining cracking process of pressure tunnels , 2013 .
[14] Cuiying Zhou,et al. Modeling Free-Surface Seepage Flow in Complicated Fractured Rock Mass Using a Coupled RPIM-FEM Method , 2017, Transport in Porous Media.
[15] Xiong Xiao,et al. Stability analysis of the slope around flood discharge tunnel under inner water exosmosis at Yangqu hydropower station , 2013 .
[16] G Fernandez,et al. BEHAVIOR OF PRESSURE TUNNELS AND GUIDELINES FOR LINER DESIGN. DISCUSSION AND CLOSURE , 1994 .
[17] Ming Xiao,et al. Study on coupled seepage and stress fields in the concrete lining of the underground pipe with high water pressure , 2009 .
[18] W. Weibull. A Statistical Distribution Function of Wide Applicability , 1951 .
[19] Julio Flórez-López,et al. Simplified modeling of cracking in concrete: Application in tunnel linings , 2014 .
[20] Ludovic Jason,et al. A new bond slip model for reinforced concrete structures: Validation by modelling a reinforced concrete tie , 2015 .
[21] A. Schleiss. Design criteria applied for the Lower Pressure Tunnel of the North Fork Stanislaus River Hydroelectric Project in California , 1988 .
[22] J. S. Y. Wang,et al. Validity of cubic law for fluid flow in a deformable rock fracture. Technical information report No. 23 , 1979 .