Computerizing ICBF Method for Schedule Delay Analysis

Schedule delay is a common construction dispute. For analyzing schedule delays, a previous study had proposed an academic analysis method, the “isolated collapsed but-for” (ICBF) method. However, because many construction projects involve numerous complex activities, the procedure of using the ICBF method for schedule delay analysis is time-consuming. Therefore, this study used Microsoft Visual Basic for Applications (VBA) language and spreadsheet techniques to develop an Excel-based program for rapid delay analysis rather than manual calculation. A case study confirmed that the program automatically produces analytical results with only common delay documents (as-planned and as-built schedules and identified delay events). Compared with previous studies, schedule analysts can obtain analysis results quickly and correctly. Research results provide not only a convenient tool for schedule delay analysis but also a guide to computerize various academic delay analysis methods in the future.

[1]  Abid Nadeem,et al.  Improving existing delay analysis techniques for the establishment of delay liabilities , 2004 .

[2]  Ekambaram Palaneeswaran,et al.  An integrated decision support system for dealing with time extension entitlements , 2008 .

[3]  James E. Diekmann,et al.  Concurrent delays in construction projects , 1987 .

[4]  David Arditi,et al.  Selecting a delay analysis method in resolving construction claims , 2006 .

[5]  Satish Mohan,et al.  Current delay analysis techniques and improvements , 2005 .

[6]  Jyh-Bin Yang,et al.  Review of Delay Analysis Methods: A Process-Based Comparison , 2009 .

[7]  Jyh-Bin Yang,et al.  SYSTEM REQUIREMENT ANALYSIS OF A CONSTRUCTION DELAY ANALYSIS SYSTEM , 2006 .

[8]  Kirk D. Gothand Schedule delay analysis: Modified windows approach , 2003 .

[9]  Andrew Baldwin,et al.  A methodology for assessing construction project delays , 1998 .

[10]  Tony Farrow Developments in the Analysis of Extensions of Time , 2007 .

[11]  Abdulaziz A. Bubshait,et al.  Comparison of delay analysis methodologies , 1998 .

[12]  Frank F Saccomanno,et al.  Modified but-for method for delay analysis , 2005 .

[13]  Tarek Hegazy,et al.  Daily Windows Delay Analysis , 2005 .

[14]  Jyh-Bin Yang,et al.  Isolated Collapsed But-For Delay Analysis Methodology , 2009 .

[15]  Sabah Alkass,et al.  Computer aided construction delay analysis and claims preparation , 1995 .

[16]  Sabah Alkass,et al.  Construction delay analysis techniques , 1996 .