Enhancing Engineering Project Management Through Process Alignment

[1]  Remon F. Aziz,et al.  Applying lean thinking in construction and performance improvement , 2013 .

[2]  A. Griffin PRODUCT DEVELOPMENT CYCLE TIME FOR BUSINESS-TO-BUSINESS PRODUCTS , 2002 .

[3]  H. Chesbrough Business Model Innovation: Opportunities and Barriers , 2010 .

[4]  Paul P. Tallon A Process-Oriented Perspective on the Alignment of Information Technology and Business Strategy , 2007, J. Manag. Inf. Syst..

[5]  Robin S. de Graaf,et al.  Exploring Team Effectiveness in Systems Engineering Construction Projects: Explanations Why Some SE Teams Are More Effective than Others , 2018, Systems Research and Behavioral Science.

[6]  Peerasit Patanakul,et al.  Managing large-scale IS/IT projects in the public sector: Problems and causes leading to poor performance , 2014 .

[7]  Baruch Keren,et al.  A decision-making support system module for project manager selection according to past performance , 2013 .

[8]  Claude Baron,et al.  Optimising product development in industry by alignment of the ISO/IEC 15288 systems engineering standard and the PMBoK guide , 2017 .

[9]  Abbas Mardani,et al.  Multiple criteria decision-making techniques and their applications – a review of the literature from 2000 to 2014 , 2015 .

[10]  Hajo A. Reijers,et al.  Business process maturity models: a systematic literature review , 2016 .

[11]  Alexander Kossiakoff,et al.  Systems Engineering Principles and Practice , 2020 .

[12]  Chih-Tung Hsiao,et al.  Industrial Development Research by Systems Approach in NICs: The Case in Taiwan , 2014 .

[13]  Nils Brunsson,et al.  The Dynamics of Standardization: Three Perspectives on Standards in Organization Studies , 2012 .

[14]  Indranil Bose,et al.  Business intelligence for performance measurement: A case based analysis , 2018, Decis. Support Syst..

[15]  Angappa Gunasekaran,et al.  Systematic literature review of project failures: Current trends and scope for future research , 2019, Comput. Ind. Eng..

[16]  K. Davis,et al.  An empirical investigation into different stakeholder groups perception of project success , 2017 .

[17]  Harry Boer,et al.  The impact of product-process complexity and new product development order winners on new product development performance: The mediating role of collaborative competence , 2016 .

[18]  Mustafa V. Uzumeri,et al.  ISO 9000 and other metastandards: Principles for management practice? , 1997 .

[19]  Robert W. Zmud,et al.  A Contingency Approach to Software Project Coordination , 2002, J. Manag. Inf. Syst..

[20]  George Dasher,et al.  The interface between systems engineering and program management , 2003, IEEE Engineering Management Review.

[21]  James Martin Processes for Engineering a System , 2000 .

[22]  Jan Mendling,et al.  Challenges of smart business process management: An introduction to the special issue , 2017, Decis. Support Syst..

[23]  Mark Langley,et al.  Toward a New Mindset: Bridging the Gap Between Program Management and Systems Engineering , 2011 .

[24]  Michael H. Morris,et al.  The entrepreneur's business model: toward a unified perspective , 2005 .

[25]  S. Hart A Natural-Resource-Based View of the Firm , 1995 .

[26]  Paul J. Componation,et al.  A Preliminary Assessment of the Relationships Between Project Success, System Engineering, and Team Organization , 2008 .

[27]  Eric Rebentisch,et al.  Survey Report: Improving Integration of Program Management and Systems Engineering , 2013 .

[28]  J. Manyika,et al.  Disruptive technologies: Advances that will transform life, business, and the global economy , 2013 .

[29]  Giorgio Locatelli,et al.  Systems Engineering to improve the governance in complex project environments , 2014 .

[30]  Eric S. Rebentisch,et al.  Integrating Program Management and Systems Engineering: Processes, Tools and Organizational Systems for Improving Performance , 2017 .

[31]  Steven Turner,et al.  The Value of Systems Engineering in Project Management: Case Study: Developing a Power Control System ConOps , 2016 .

[32]  A. Millington,et al.  Stakeholder Pressure, Organizational Size, and the Allocation of Departmental Responsibility for the Management of Corporate Charitable Giving , 2004 .

[33]  Simon P. Philbin Managing Complex Technology Projects , 2008 .

[34]  Swee C. Goh,et al.  Managing effective knowledge transfer: an integrative framework and some practice implications , 2002, J. Knowl. Manag..

[35]  K. Johnston,et al.  The influence of business managers' IT competence on IT project success , 2017 .

[36]  Hamid Demmou,et al.  Managing systems engineering processes: A multi-standard approach , 2014, 2014 IEEE International Systems Conference Proceedings.

[37]  Lerina Aversano,et al.  Managing the alignment between business processes and software systems , 2016, Inf. Softw. Technol..

[38]  Harvey Maylor,et al.  Understand, reduce, respond: project complexity management theory and practice , 2017 .

[39]  Kevin D. Barber,et al.  An Intranet based system as an enabler in effective project management and implementation of quality standards: A case study , 2009 .

[40]  T. Saaty Decision making — the Analytic Hierarchy and Network Processes (AHP/ANP) , 2004 .

[41]  Eoin O'Sullivan,et al.  Standardisation framework to enable complex technological innovations: The case of photovoltaic technology , 2018, Journal of Engineering and Technology Management.

[42]  Alan F. Blackwell,et al.  Radical innovation: crossing knowledge boundaries with interdisciplinary teams , 2009 .

[43]  Jan Terje Karlsen,et al.  Project Stakeholder Management , 2002 .

[44]  Claudio Cruz-Cázares,et al.  Openness and management systems integration: Pursuing innovation benefits , 2018, Journal of Engineering and Technology Management.

[45]  Claude Y. Laporte,et al.  Developing and implementing systems engineering and project management processes at CSiT - A small Canadian company in public transportation , 2016 .

[46]  Alberto Sols,et al.  Integrating Reliability in Systems Engineering Management , 2019, Engineering Management Journal.

[47]  Ching-Hsue Cheng,et al.  Evaluating weapon system using fuzzy analytic hierarchy process based on entropy weight , 1994, Proceedings of 1995 IEEE International Conference on Fuzzy Systems..

[48]  Esben Rahbek Gjerdrum Pedersen,et al.  Exploring the Relationship Between Business Model Innovation, Corporate Sustainability, and Organisational Values within the Fashion Industry , 2016, Journal of Business Ethics.

[49]  P. Hurmelinna-Laukkanen,et al.  Dealing with organizational silos with communities of practice and human resource management , 2017 .

[50]  Kwaku Atuahene-Gima,et al.  Enhancing product innovation performance in a dysfunctional competitive environment: The roles of competitive strategies and market-based assets , 2018, Industrial Marketing Management.

[51]  Li Zheng,et al.  Considering the systems engineering leading indicators to improve project performance measurement , 2017 .

[52]  John M. Colombi,et al.  An empirical methodology for human integration in the SE technical processes , 2012, Syst. Eng..

[53]  Jörg Becker,et al.  Maturity models in business process management , 2012, Bus. Process. Manag. J..

[54]  Marc H. Meyer,et al.  Product development cycle time and commercial success , 1995 .

[55]  Martí Casadesús,et al.  The impact of standardized innovation management systems on innovation capability and business performance , 2016 .

[56]  Dov Dori,et al.  Project management vs. systems engineering management: A practitioners' view on integrating the project and product domains , 2011, Syst. Eng..

[57]  Guillermo A. Mendoza,et al.  Multiple criteria decision making approaches to assessing forest sustainability using criteria and indicators: a case study , 2000 .

[58]  Julie Delisle,et al.  Uncovering temporal underpinnings of project management standards , 2019, International Journal of Project Management.

[59]  Chao Liu,et al.  Implementing SCRUM to develop a connected robot , 2018, ArXiv.

[60]  Avraham Shtub,et al.  A Simulation‐Based Approach in Support of Project Management Training for Systems Engineers , 2014, Syst. Eng..

[61]  V. Anantatmula,et al.  Empirical Study of Project Managers Leadership Competence and Project Performance , 2017 .

[62]  Joseph Z. Ben-Asher,et al.  The Project Manager, Systems Engineer and the Conflict over Project Resources , 2016 .

[63]  Eileen P. Arnold 9.1.1 Systems Engineering and Project Management Intersects and Confusion , 2012 .

[64]  Alexander Kossiakoff,et al.  Systems Engineering Principles and Practice: Kossiakoff/Systems Engineering 2E , 2011 .

[65]  Timothy L.J. Ferris,et al.  Re-evaluating Systems Engineering as a Framework for Tackling Systems Issues , 2007 .

[66]  Béatrix Barafort,et al.  Benefits Resulting from the Combined Use of ISO/IEC 15504 with the Information Technology Infrastructure Library (ITIL) , 2002, PROFES.

[67]  L. Sproull,et al.  Coordinating Expertise in Software Development Teams , 2000 .