Lot streaming in a two-machine mixed shop
暂无分享,去创建一个
[1] Jose A. Ventura,et al. Minimizing the mean weighted absolute deviation from due dates in lot-streaming flow shop scheduling , 2002, Comput. Oper. Res..
[2] S. M. Johnson,et al. Optimal two- and three-stage production schedules with setup times included , 1954 .
[3] F. Can Çinkaya,et al. Unit sized transfer batch scheduling with setup times , 1992 .
[4] In-Jae Jeong,et al. Flow shop scheduling with no-wait flexible lot streaming using an adaptive genetic algorithm , 2009 .
[5] S. Reiter. A System for Managing Job-Shop Production , 1966 .
[6] Marco Pranzo,et al. Batch scheduling in a two-machine flow shop with limited buffer and sequence independent setup times and removal times , 2004, Eur. J. Oper. Res..
[7] Ching-Jong Liao,et al. A discrete particle swarm optimization for lot-streaming flowshop scheduling problem , 2008, Eur. J. Oper. Res..
[8] Ferda Can Çetinkaya,et al. Unit sized transfer batch scheduling in an automated two-machine flow-line cell with one transport agent , 2006 .
[9] T. P. Bagchi,et al. Lot streaming and scheduling heuristics for m -machine no-wait flowshops , 2000 .
[10] Ferda Can Çetinkaya,et al. Lot Streaming in a Two-stage Flow Shop with Set-up, Processing and Removal Times Separated , 1994 .
[11] R. G. Vickson,et al. Two- and three-machine flow shop scheduling problems with equal sized transfer batches , 1992 .
[12] N. Jawahar,et al. Evolutionary algorithms for scheduling m-machine flow shop with lot streaming , 2008 .
[13] Wei Zhang,et al. Multi-job lot streaming to minimize the mean completion time in m-1 hybrid flowshops , 2005 .
[14] Clarence H. Martin,et al. A hybrid genetic algorithm/mathematical programming approach to the multi-family flowshop scheduling problem with lot streaming , 2009 .
[15] Alper Sen,et al. Lot streaming in open shops , 1998, Oper. Res. Lett..
[16] Udo Buscher,et al. An integrated tabu search algorithm for the lot streaming problem in job shops , 2009, Eur. J. Oper. Res..
[17] Kenneth R. Baker,et al. Lot streaming in the two-machine flow shop with setup times , 1995, Ann. Oper. Res..
[18] C. Sriskandarajah,et al. Lot streaming and scheduling multiple products in two-machine no-wait flowshops , 1999 .
[19] Huan Neng Chiu,et al. A comprehensive review of lot streaming , 2005 .
[20] N. Jawahar,et al. Threshold accepting and Ant-colony optimization algorithms for scheduling m-machine flow shops with lot streaming , 2009 .
[21] Stéphane Dauzère-Pérès,et al. Lot Streaming in Job-Shop Scheduling , 1997, Oper. Res..
[22] Shen-Ming Lee,et al. Transfer batch scheduling for a two-stage flowshop with identical parallel machines at each stage , 1997 .
[23] Teofilo F. Gonzalez,et al. Open Shop Scheduling to Minimize Finish Time , 1976, JACM.
[24] D. Biskup,et al. Lot streaming in a multiple product permutation flow shop with intermingling , 2008 .
[25] Hiroaki Ishii,et al. The mixed shop scheduling problem , 1985, Discret. Appl. Math..
[26] R. Vickson. Optimal lot streaming for multiple products in a two-machine flow shop , 1995 .
[27] Chih-Ming Hsu,et al. Benefits of lot splitting in job-shop scheduling , 2004 .
[28] Subhash C. Sarin,et al. Evaluation of the potential benefits of lot streaming in flow-shop systems , 2000 .
[29] Chris N. Potts,et al. Flow shop scheduling with lot streaming , 1989 .