Repository operational criteria comparative analysis
暂无分享,去创建一个
The objective of the ``Repository Operational Criteria (ROC) Feasibility Studies`` (or ROC task) was to conduct comprehensive and integrated analyses of repository design, construction, and operations criteria in 10 CFR Part 60 regulations considering the interfaces among the components of the regulations and impacts of any potential changes to those regulations. The ROC task addresses regulatory criteria and uncertainties related to the preclosure aspects of the geologic repository. Those parts of 10 CFR Part 60 that require routine guidance or minor changes to the rule were addressed in Hageman and Chowdhury, 1992. The ROC task shows a possible need for further regulatory clarity, by major changes to the rule, related to the design bases and siting of a geologic repository operations area and radiological emergency planning in order to assure defense-in-depth. The analyses, presented in this report, resulted in the development and refinement of regulatory concepts and their supporting rationale for recommendations for potential major changes to 10 CFR Pan 0 regulations.