A Note on the Generation of Project Network Diagrams
暂无分享,去创建一个
The problem of creating an activity-on-arrow network diagram from activity precedence data is considered. An heuristic is described which is incorporated into a computer program that can tackle problems of a practical size. Some computational experience is reported.
[1] K. G. Lockyer. An introduction to critical path analysis , 1965 .
[2] Joseph J. Moder,et al. Project Management with CPM and PERT , 1964 .
[3] Bernard Dimsdale. Computer Construction of Minimal Project Networks , 1963, IBM Syst. J..
[4] D. R. Fulkerson,et al. Flows in Networks. , 1964 .
[5] Albert Battersby,et al. Network analysis for planning and scheduling , 1970 .