Long term behavior of two component back-fill grout mix used in full face mechanized tunneling
暂无分享,去创建一个
Daniele Peila | E. Dal Negro | Andrea Picchio | Alessio Chieregato | Daniele Martinelli | Ravi P. Shah | C. Salazar Onate | A. Boscaro | C. Onate | D. Peila | D. Martinelli | A. Boscaro | A. Chieregato | E. Negro | A. Picchio
[1] E Negro,et al. Ground conditioning: STEP Abu Dhabi sewer project , 2013 .
[2] Daniele Peila,et al. Back-filling grout with two component mix in EPB tunneling to minimize the surface settlements:Rome Metro - Line C case history , 2011 .
[3] Sebastiano Pelizza,et al. Analysis of the Performance of Two Component Back-filling Grout in Tunnel Boring Machines Operating under Face Pressure , 2010 .
[4] Daniele Peila,et al. The behaviour of a two-component backfilling grout used in a Tunnel-Boring Machine , 2011 .