Vendor Managed Inventory (VMI) with Consignment Stock (CS) agreement for a two-level supply chain with an imperfect production process with/without restoration interruptions

A vendor managed system with the Consignment Stock agreement is a business practice where a buyer׳s inventory remains the property of the vendor until its withdrawal by the final customer demand. Such an agreement has shown to be a profitable stock management approach, especially when operating in uncertain environments where delivery lead times and/or market demand vary over time.

[1]  C. Glock The joint economic lot size problem: A review , 2012 .

[2]  Mehmet Gumus,et al.  Impact of Consignment Inventory and Vendor-Managed Inventory for a Two-Party Supply Chain , 2006 .

[3]  D. Battini,et al.  Consignment stock inventory policy: methodological framework and model , 2010 .

[4]  M. Jaber,et al.  Vendor-managed inventory with consignment stock agreement for single vendor–single buyer under the emission-trading scheme , 2014 .

[5]  M. Braglia,et al.  Modelling an industrial strategy for inventory management in supply chains: The 'Consignment Stock' case , 2003 .

[6]  Mohamad Y. Jaber,et al.  Coordinating a two-level supply chain with production interruptions to restore process quality , 2008, Comput. Ind. Eng..

[7]  Jen-Ming Chen,et al.  Channel coordination under consignment and vendor-managed inventory in a distribution system , 2010 .

[8]  Elliot Rabinovich,et al.  What is the “right” inventory management approach for a purchased item? , 2006 .

[9]  Timothy L. Urban Analysis of production systems when run length influences product quality , 1998 .

[10]  Evan L. Porteus Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction , 1986, Oper. Res..

[11]  C. S. P. Rao,et al.  Consignment stock policy with controllable lead time for effective inventory management in supply chains , 2007, Int. J. Manuf. Technol. Manag..

[12]  A. Banerjee A JOINT ECONOMIC-LOT-SIZE MODEL FOR PURCHASER AND VENDOR , 1986 .

[13]  Moutaz Khouja,et al.  The impact of quality considerations on material flow in two-stage inventory systems , 2003 .

[14]  Lucio Zavanella,et al.  The consignment stock of inventories: industrial case and performance analysis , 2003 .

[15]  Moutaz Khouja The use of minor setups within production cycles to improve product quality and yield , 2005, Int. Trans. Oper. Res..

[16]  Abhijit Gosavi,et al.  A Reinforcement Learning Approach for Inventory Replenishment in Vendor-Managed Inventory Systems With Consignment Inventory , 2010 .

[17]  J. Holmström,et al.  Supply chain collaboration: making sense of the strategy continuum , 2005 .

[18]  Philip M. Kaminsky,et al.  Designing and managing the supply chain : concepts, strategies, and case studies , 2007 .

[19]  M. Jaber,et al.  Vendor managed inventory (VMI) with consignment considering learning and forgetting effects , 2012 .

[20]  Maurice Bonney,et al.  An economic order quantity (EOQ) for items with imperfect quality and inspection errors , 2011 .

[21]  M. Jaber,et al.  Supply chain coordination with emissions reduction incentives , 2013 .

[22]  M. Jaber,et al.  Coordinating a three-level supply chain with learning-based continuous improvement , 2010 .

[23]  P. A. Hayek,et al.  Production lot sizing with the reworking of imperfect quality items produced , 2001 .

[24]  K. Sari Exploring the benefits of vendor managed inventory , 2007 .

[25]  Roger M. Hill,et al.  The optimal production and shipment policy for the single-vendor singlebuyer integrated production-inventory problem , 1999 .

[26]  S. Goyal “A JOINT ECONOMIC‐LOT‐SIZE MODEL FOR PURCHASER AND VENDOR”: A COMMENT* , 1988 .

[27]  E. Raaij,et al.  Performance outcomes and success factors of vendor managed inventory (VMI) , 2008 .

[28]  Simone Zanoni,et al.  A note on an industrial strategy for stock management in supply chains: modelling and performance evaluation , 2004 .

[29]  R. Hill The single-vendor single-buyer integrated production-inventory model with a generalised policy , 1997 .

[30]  Andrea Grassi,et al.  Consignment stock of inventories in the presence of obsolescence , 2005 .

[31]  Meir J. Rosenblatt,et al.  Economic Production Cycles with Imperfect Production Processes , 1986 .

[32]  Suresh Kumar Goyal,et al.  An integrated inventory model for a single supplier-single customer problem , 1977 .

[33]  Ron S. Kenett,et al.  The impact of defects on a process with rework , 1995 .