Vendor Managed Inventory (VMI) with Consignment Stock (CS) agreement for a two-level supply chain with an imperfect production process with/without restoration interruptions
暂无分享,去创建一个
Mohamad Y. Jaber | Simone Zanoni | Lucio Zavanella | Ehab Bazan | M. Jaber | Ehab Bazan | S. Zanoni | L. Zavanella
[1] C. Glock. The joint economic lot size problem: A review , 2012 .
[2] Mehmet Gumus,et al. Impact of Consignment Inventory and Vendor-Managed Inventory for a Two-Party Supply Chain , 2006 .
[3] D. Battini,et al. Consignment stock inventory policy: methodological framework and model , 2010 .
[4] M. Jaber,et al. Vendor-managed inventory with consignment stock agreement for single vendor–single buyer under the emission-trading scheme , 2014 .
[5] M. Braglia,et al. Modelling an industrial strategy for inventory management in supply chains: The 'Consignment Stock' case , 2003 .
[6] Mohamad Y. Jaber,et al. Coordinating a two-level supply chain with production interruptions to restore process quality , 2008, Comput. Ind. Eng..
[7] Jen-Ming Chen,et al. Channel coordination under consignment and vendor-managed inventory in a distribution system , 2010 .
[8] Elliot Rabinovich,et al. What is the “right” inventory management approach for a purchased item? , 2006 .
[9] Timothy L. Urban. Analysis of production systems when run length influences product quality , 1998 .
[10] Evan L. Porteus. Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction , 1986, Oper. Res..
[11] C. S. P. Rao,et al. Consignment stock policy with controllable lead time for effective inventory management in supply chains , 2007, Int. J. Manuf. Technol. Manag..
[12] A. Banerjee. A JOINT ECONOMIC-LOT-SIZE MODEL FOR PURCHASER AND VENDOR , 1986 .
[13] Moutaz Khouja,et al. The impact of quality considerations on material flow in two-stage inventory systems , 2003 .
[14] Lucio Zavanella,et al. The consignment stock of inventories: industrial case and performance analysis , 2003 .
[15] Moutaz Khouja. The use of minor setups within production cycles to improve product quality and yield , 2005, Int. Trans. Oper. Res..
[16] Abhijit Gosavi,et al. A Reinforcement Learning Approach for Inventory Replenishment in Vendor-Managed Inventory Systems With Consignment Inventory , 2010 .
[17] J. Holmström,et al. Supply chain collaboration: making sense of the strategy continuum , 2005 .
[18] Philip M. Kaminsky,et al. Designing and managing the supply chain : concepts, strategies, and case studies , 2007 .
[19] M. Jaber,et al. Vendor managed inventory (VMI) with consignment considering learning and forgetting effects , 2012 .
[20] Maurice Bonney,et al. An economic order quantity (EOQ) for items with imperfect quality and inspection errors , 2011 .
[21] M. Jaber,et al. Supply chain coordination with emissions reduction incentives , 2013 .
[22] M. Jaber,et al. Coordinating a three-level supply chain with learning-based continuous improvement , 2010 .
[23] P. A. Hayek,et al. Production lot sizing with the reworking of imperfect quality items produced , 2001 .
[24] K. Sari. Exploring the benefits of vendor managed inventory , 2007 .
[25] Roger M. Hill,et al. The optimal production and shipment policy for the single-vendor singlebuyer integrated production-inventory problem , 1999 .
[26] S. Goyal. “A JOINT ECONOMIC‐LOT‐SIZE MODEL FOR PURCHASER AND VENDOR”: A COMMENT* , 1988 .
[27] E. Raaij,et al. Performance outcomes and success factors of vendor managed inventory (VMI) , 2008 .
[28] Simone Zanoni,et al. A note on an industrial strategy for stock management in supply chains: modelling and performance evaluation , 2004 .
[29] R. Hill. The single-vendor single-buyer integrated production-inventory model with a generalised policy , 1997 .
[30] Andrea Grassi,et al. Consignment stock of inventories in the presence of obsolescence , 2005 .
[31] Meir J. Rosenblatt,et al. Economic Production Cycles with Imperfect Production Processes , 1986 .
[32] Suresh Kumar Goyal,et al. An integrated inventory model for a single supplier-single customer problem , 1977 .
[33] Ron S. Kenett,et al. The impact of defects on a process with rework , 1995 .