Supply chain scheduling: Sequence coordination

A critical issue in supply chain management is coordinating the decisions made by decision makers at different stages, for example a supplier and one or several manufacturers. We model this issue by assuming that both the supplier and each manufacturer have an ideal schedule, determined by their own costs and constraints. An interchange cost is incurred by the supplier or a manufacturer whenever the relative order of two jobs in its actual schedule is different from that in its ideal schedule. An intermediate storage buffer is available to resequence the jobs between the two stages. We consider the problems of finding an optimal supplier's schedule, an optimal manufacturer's schedule, and optimal schedules for both. The objective functions we consider are the minimization of total interchange cost, and of total interchange plus buffer storage cost. We describe efficient algorithms for all the supplier's and manufacturers' problems, as well as for a special case of the joint scheduling problem. The running time of these algorithms is polynomial in both the number of jobs and the number of manufacturers. Finally, we identify conditions under which cooperation between the supplier and a manufacturer reduces their total cost.

[1]  大野 耐一,et al.  Toyota production system : beyond large-scale production , 1988 .

[2]  Raghavan Rama,et al.  On Sorting by 3-Bounded Transpositions , 2003, Electron. Notes Discret. Math..

[3]  E.L. Lawler,et al.  Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey , 1977 .

[4]  Chris N. Potts,et al.  Supply chain scheduling: Batching and delivery , 2003, Oper. Res..

[5]  Rajiv D. Banker,et al.  Economics of operations management: A research perspective , 1995 .

[6]  Arnaldo Hernández del Campo Just-in-time manufacturing : a practical approach , 1989 .

[7]  Rakesh Nagi,et al.  A review of integrated analysis of production-distribution systems , 1999 .

[8]  Douglas J. Thomas,et al.  Coordinated supply chain management , 1996 .

[9]  Mari Sako,et al.  Supplier Relations in Japan and the United States , 1995 .

[10]  Zhi-Long Chen,et al.  Machine scheduling with transportation considerations , 2001 .

[11]  Asoo J. Vakharia,et al.  Integrated production/distribution planning in supply chains: An invited review , 1999, Eur. J. Oper. Res..

[12]  Yiannis Gabriel,et al.  Logistics of Production and Inventory , 1993, Handbooks in Operations Research and Management Science.

[13]  Chris Beckett,et al.  Just in Time vs. Just in Case , 2003 .

[14]  U. Karmarkar Integrative Research in Marketing and Operations Management , 1996 .

[15]  Zhi-Long Chen,et al.  SUPPLY CHAIN SCHEDULING: ASSEMBLY SYSTEMS , 2000 .

[16]  D. Blumenfeld,et al.  Synchronizing production and transportation schedules , 1991 .

[17]  Z. K. Weng,et al.  Pricing and ordering strategies in manufacturing and distribution alliances , 1997 .

[18]  Marshall L. Fisher,et al.  Coordination of production and distribution planning , 1994 .

[19]  Alessandro Agnetis,et al.  Set-Up Coordination between Two Stages of a Supply Chain , 2001, Ann. Oper. Res..

[20]  Sridhar Seshadri,et al.  Policy mechanisms for supply chain coordination , 2000, IIE Transactions.

[21]  Arthur P. Hurter,et al.  THE NEWSPAPER PRODUCTION/DISTRIBUTION PROBLEM. , 1996 .

[22]  Graham K. Rand,et al.  Logistics of Production and Inventory , 1995 .

[23]  R. Akella,et al.  Diversification under supply uncertainty , 1993 .