Probabilistic methods applied to electric power systems-are they worth it?

The authors reflect on and question existing approaches to maintaining and improving the reliability of power systems and review and highlight some alternative ways forward. They also question the need and usefulness of present deterministic criteria and security standards and instead suggest that integrated cost benefit analyses involving customers and their decisions could be a more rewarding and applicable approach.

[1]  George J. Anders,et al.  Probability Concepts in Electric Power Systems , 1990 .

[2]  Roy Billinton,et al.  Reliability Assessment of Large Electric Power Systems , 1988 .

[3]  N. Ramani,et al.  Wind Direction and Extreme Wind Loads for Overhead Power Line Design , 1987 .

[4]  Alain H. Peyrot,et al.  Practical Code Formats for Reliability Based Design of Transmission Structures , 1987 .

[5]  E. G. Neudorf,et al.  Probabilistic Short-Circuit Uprating of Station Strain Bus System-Overview and Application , 1986, IEEE Transactions on Power Delivery.

[6]  R. Sugarman,et al.  `What's new, teacher?' ask the computer , 1978, IEEE Spectrum.

[7]  Ronald N. Allan,et al.  Probabilistic load flow using multilinearisations , 1981 .

[8]  Roy Billinton,et al.  Applied reliability assessment in electric power systems , 1991 .

[9]  R. Billinton,et al.  Comprehensive Bibliography On Electrical Service Interruption Costs , 1983, IEEE Transactions on Power Apparatus and Systems.

[10]  R. Billinton,et al.  A Probabilistic Index for Transient Stability , 1980, IEEE Transactions on Power Apparatus and Systems.

[11]  Roy Billinton,et al.  Reliability evaluation of power systems , 1984 .

[12]  Ronald N. Allan,et al.  Probabilistic analysis of power flows , 1974 .

[13]  Ronald N. Allan,et al.  Bibliography on the Application of Probability Methods in Power System Reliability Evaluation 1996-1999 , 1984 .

[14]  Barbara Borkowska,et al.  Probabilistic Load Flow , 1974 .

[15]  Roy Jensen,et al.  Reliability Modeling in Electric Power Systems , 1979 .

[16]  C. W. Watchorn The Determination and Allocation of the Capacity Benefits Resulting from Interconnecting Two or More Generating Systems , 1950, Transactions of the American Institute of Electrical Engineers.

[17]  G. L. Ford,et al.  Analytical methods for probabilistic short-circuit studies , 1982 .

[18]  G. Orawski,et al.  Reliability Based Design of Transmission Lines According to Recent Advances by IEC and CIGRE , 1987 .