Comparison of operational availability of public city buses by analysis of variance

There are numerous works on availability studies, among others. In [3] a general overview of main strategies and technical steps which should be taken when designing an optimum public transportation system. Operational availability as a characteristic of transportation systems is used for analysis of so-called fast reaction systems in random moments of operations (t), for example air force, emergency medical services, fire brigades or public transportation systems [5]. Analysis of availability of different systems has been researched into by many studies in recent years. Nowadays it is applied in many sectors of the industry, including aircraft and defense sectors as well as power engineering and transportation. In [5] the authors present the possibilities of application of the RAM (Reliability, Availability and Maintainability) model in industry to identify unreliable devices with respect to operation-related frequent failures or requirements. In [23] the authors investigate the dependencies between availability and maintainability of transportation modes and the costs of unplanned breaks and vehicle operation. The authors developed an economically-optimum model of implementation for inspection and technical services that was based on current data on vehicle damage. The study [19] examined several scenarios regarding the reliability of buses and repair service employees’ shift system in a transport company to increase the vehicle’s availability and reduce costs of the whole system regarding its disturbance at vehicle failure. In [18] and [28] the authors present an optimization model of public transportation considering the design of transit routes, selection of modes of transportation and timetables. The study [24] presents a method of designing the availability of technological objects, and in [10] a theory pertaining to semi-Markov processes was used based on the authentic municipal transport system. In [2] the authors identified the object’s aptitude condition, and thus optimal control processes of operation and service of particular objects on the example of public transportation bus engines. In [27] the authors present different methods applied to estimate a functional form between overall quality of service and explanatory variables, including questionnaire items related to satisfaction accessibility (availability, information, time characteristics of service, customer service, comfort, safety, infrastructure and environment). The operational availability index was mainly used for bus schedule reliability and current monitoring of transportation systems, especially vehicle punctuality [3, 4, 26] however, it was not often used to control quality management systems and maintenance of a given make of a vehicle. The municipal transport company should assure a continuous monitoring on maintenance process in terms of current availability of used fleet. Resting on this assumption, the authors of the paper conducted studies on operational availability of buses of the selected makes from Joanna RymARz Andrzej NiewczAs Aneta KRzyżAK

[1]  Kathrin Abendroth Handbook Of Reliability Availability Maintainability And Safety In Engineering Design , 2016 .

[2]  Ashok Kumar,et al.  Development and application of a methodology to identify and rank the important factors affecting in-vehicle particulate matter. , 2012, Journal of hazardous materials.

[3]  Paweł Lindstedt,et al.  Method of assessment of technical object aptitude in environment of exploitation and service conditions , 2015 .

[4]  P. Bruno,et al.  Annoyance evaluation and the effect of noise on the health of bus drivers. , 2013, Noise & health.

[5]  Adel A. Ghobbar,et al.  Optimizing inspection intervals - Reliability and availability in terms of a cost model: A case study on railway carriers , 2013, Reliab. Eng. Syst. Saf..

[6]  T. Ledwina Recenzja: J. Koronacki, J. Mielniczuk, Statystyka dla studentów kierunków technicznych i przyrodniczych , 2017 .

[7]  Irina Yatskiv,et al.  Urban Public Transport System's Reliability Estimation Using Microscopic Simulation , 2012 .

[8]  Mehmet Savsar,et al.  Modeling and simulation of maintenance operations at Kuwait public transport company , 2013 .

[9]  Maciej SzkodA,et al.  Assessment of Reliability, Availability and Maintainability of Rail Gauge Change Systems , 2014 .

[10]  A. Conejo,et al.  Power system observability via optimization , 2013 .

[11]  Hoang Pham,et al.  Handbook of reliability engineering , 2013 .

[12]  Satnisław Legutko Podstawy eksploatacji maszyn i urządzeń , 2004 .

[13]  Enrico Zio,et al.  Reliability engineering: Old problems and new challenges , 2009, Reliab. Eng. Syst. Saf..

[14]  Jin-Kao Hao,et al.  Transit network design and scheduling: A global review , 2008 .

[15]  Andrzej Niewczas,et al.  Effectivness Of The Failure Rate On Maintenance Costs Of The City Buses , 2015 .

[16]  Andrzej Niewczas,et al.  RELIABILITY ANALYSIS OF THE SELECTED BRANDS OF CITY BUSES AT MUNICIPAL TRANSPORT COMPANY / PORÓWNAWCZA ANALIZA NIEZAWODNOŚCI AUTOBUSÓW KOMUNIKACJI MIEJSKIEJ , 2013 .

[17]  K. Migawa Semi-Markov model of the availability of the means of municipal transport system , 2009 .

[18]  Boulevard Lavoisier,et al.  Transit Network Timetabling and Vehicle Assignment for Regulating Authorities , 2010 .

[19]  Paulien M. Herder,et al.  Industrial application of RAM modeling: Development and implementation of a RAM simulation model for the Lexan® plant at GE Industrial, Plastics , 2008, Reliab. Eng. Syst. Saf..

[20]  Antonio Sánchez Soliño,et al.  Optimizing performance-based mechanisms in road management: an agency theory approach , 2015 .

[21]  Grzegorz Koszalka,et al.  Chosen Aspects of Municipal Transport Operation on the Example of the City of Lublin , 2008 .

[22]  Andrzej Niewczas,et al.  Ocena gotowości technicznej autobusów komunikacji miejskiej na przykładzie miejskiego przedsiębiorstwa komunikacyjnego w Lublinie , 2012 .

[23]  Carlos F. Daganzo,et al.  Dynamic bus holding strategies for schedule reliability: Optimal linear control and performance analysis , 2011 .

[24]  Fang Zhao,et al.  Optimization of transit route network, vehicle headways and timetables for large-scale transit networks , 2008, Eur. J. Oper. Res..