A new approach to the learning effect: Beyond the learning curve restrictions
暂无分享,去创建一个
[1] T. P. Wright,et al. Factors affecting the cost of airplanes , 1936 .
[2] Raymond E. Miller,et al. Complexity of Computer Computations , 1972 .
[3] Kenneth Steiglitz,et al. Combinatorial Optimization: Algorithms and Complexity , 1981 .
[4] Guoqing Wang,et al. Single Machine Scheduling with Learning Effect Considerations , 2000, Ann. Oper. Res..
[5] Alwyn Young,et al. Learning by Doing and the Dynamic Effects of International Trade , 1991 .
[6] E.L. Lawler,et al. Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey , 1977 .
[7] Gur Mosheiov,et al. Parallel machine scheduling with a learning effect , 2001, J. Oper. Res. Soc..
[8] Gur Mosheiov,et al. Scheduling with general job-dependent learning curves , 2003, Eur. J. Oper. Res..
[9] Dirk Biskup,et al. Single-machine scheduling with learning considerations , 1999, Eur. J. Oper. Res..
[10] Adam Janiak,et al. Scheduling jobs with position-dependent processing times , 2004, J. Oper. Res. Soc..
[11] T. C. Edwin Cheng,et al. Single machine scheduling with a variable common due date and resource-dependent processing times , 2003, Comput. Oper. Res..
[12] Gur Mosheiov,et al. Note on scheduling with general learning curves to minimize the number of tardy jobs , 2005, J. Oper. Res. Soc..
[13] J. M. Moore. An n Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs , 1968 .
[14] Sartaj Sahni,et al. Algorithms for Scheduling Independent Tasks , 1976, J. ACM.
[15] Richard M. Karp,et al. Reducibility Among Combinatorial Problems , 1972, 50 Years of Integer Programming.
[16] Bertrand M. T. Lin,et al. A concise survey of scheduling with time-dependent processing times , 2004, Eur. J. Oper. Res..
[17] Gur Mosheiov,et al. Scheduling problems with a learning effect , 2001, Eur. J. Oper. Res..
[18] Dar-Li Yang,et al. Single-machine group scheduling with a time-dependent learning effect , 2006, Comput. Oper. Res..
[19] D. Jackson. Technological Change, the Learning Curve and Profitability , 1998 .
[20] Maurice Bonney,et al. The economic manufacture/order quantity (EMQ/EOQ) and the learning curve: Past, present, and future , 1999 .
[21] Bahram Alidaee,et al. Scheduling with time dependent processing times: Review and extensions , 1999, J. Oper. Res. Soc..
[22] T. C. Edwin Cheng,et al. Single machine batch scheduling with deadlines and resource dependent processing times , 1995, Oper. Res. Lett..
[23] Louis E. Yelle. THE LEARNING CURVE: HISTORICAL REVIEW AND COMPREHENSIVE SURVEY , 1979 .