Replenishment lot sizing with failure in rework and an enhanced multi-shipment policy

This study determines the optimal replenishment lot size for a manufacturing system with failure in rework and an enhanced multi-shipment policy. An economic lot size problem incorporated a multi-delivery policy and quality assurance was examined in a recent study, with the primary intention of reducing a producer’s inventory holding cost, this paper formulated an enhanced multi-shipment distribution policy to improve the solution for such a specific problem. With a help of mathematical modelling and optimization technique, the optimal replenishment lot size for the proposed system is obtained. As a result, not only the holding cost but the entire expected system cost per unit time is minimized. A numerical example was provided to show practical applicability of the obtained results and to demonstrate significant savings in a producer’s stock holding cost.

[1]  S. Viswanathan,et al.  Optimal strategy for the integrated vendor-buyer inventory model , 1998, Eur. J. Oper. Res..

[2]  Hong-Dar Lin,et al.  Note on "replenishment run time problem with machine breakdown and failure in rework" , 2012, Expert Syst. Appl..

[3]  Marko Pfeifer,et al.  Inventory Management And Production Planning And Scheduling , 2016 .

[4]  Yuan-Shyi Peter Chiu,et al.  Mathematical modeling for determining the replenishment policy for EMQ model with rework and multiple shipments , 2011, Math. Comput. Model..

[5]  Y-S. P. Chiu,et al.  Reexamination of “Combining an alternative multi-delivery policy into economic production lot size problem with partial rework” Using an Alternative Approach , 2013 .

[6]  Singa Wang Chiu,et al.  Alternative approach to determine the common cycle time for a multi-item production system with discontinuous deliveries and failure in rework , 2013 .

[7]  C. K. Ke Research on Optimized Problem-Solving Solutions Selection of the Production Process , 2013 .

[8]  T. M. Whitin,et al.  An Optimal Final Inventory Model , 1961 .

[9]  Jonas C. P. Yu,et al.  Optimal inventory model for items with imperfect quality and shortage backordering , 2007 .

[10]  Lu Lu A one-vendor multi-buyer integrated inventory model , 1995 .

[11]  Suresh Kumar Goyal,et al.  An integrated inventory model for a single supplier-single customer problem , 1977 .

[12]  Chih Kun Ke Research on Optimized Problem-solving Solutions: Selection of the Production Process , 2013 .

[13]  Bhaba R. Sarker,et al.  Optimal manufacturing batch size with rework process at a single-stage production system , 2004, Comput. Ind. Eng..

[14]  A. Banerjee A JOINT ECONOMIC-LOT-SIZE MODEL FOR PURCHASER AND VENDOR , 1986 .

[15]  Hong-Dar Lin,et al.  A note on "intra-supply chain system with multiple sales locations and quality assurance" , 2013, Expert Syst. Appl..

[16]  Ming-Hon Hwang,et al.  Optimal common cycle time for a multi-item production system with discontinuous delivery policy and failure in rework , 2013 .

[17]  Singa Wang Chiu,et al.  Alternative approach for solving replenishment lot size problem with discontinuous issuing policy and rework , 2012, Expert Syst. Appl..

[18]  Singa Wang Chiu,et al.  Determining production–shipment policy for a vendor–buyer integrated system with rework and an amending multi-delivery schedule , 2013 .

[19]  Leroy B. Schwarz,et al.  A Simple Continuous Review Deterministic One-Warehouse N-Retailer Inventory Problem , 1973 .

[20]  Fassil Nebebe,et al.  Determination of economic production-shipment policy for a single-vendor-single-buyer system , 2000, Eur. J. Oper. Res..

[21]  Yuan-Shyi Peter Chiu,et al.  Solving an economic production lot size problem with multi-delivery policy and quality assurance using an algebraic approach , 2010 .

[22]  Yigal Gerchak,et al.  The Structure of Periodic Review Policies in the Presence of Random Yield , 1990, Oper. Res..

[23]  Frederick S. Hillier,et al.  Introduction of Operations Research , 1967 .

[24]  Tonya Boone,et al.  The Impact of Imperfect Processes on Production Run Times , 2000, Decis. Sci..

[25]  Cuauhtémoc Sánchez-Ramírez,et al.  Dynamic Self-Assessment of Supply Chains Performance: an Emerging Market Approach , 2013 .

[26]  Udo Buscher,et al.  Optimizing a production system with rework and equal sized batch shipments , 2007, Comput. Oper. Res..

[27]  Frederick S Hillier,et al.  Introduction to operations research -8/E , 2002 .

[28]  Y. Chiu,et al.  Joint determination of rotation cycle time and number of shipments for a multi-item EPQ model with random defective rate , 2013 .

[29]  Gyana R. Parija,et al.  An Optimal Batch Size for a Production System Operating Under a Fixed-Quantity, Periodic Delivery Policy , 1994 .

[30]  Singa Wang Chiu,et al.  Intra-supply chain system with multiple sales locations and quality assurance , 2013, Expert Syst. Appl..

[31]  Meir J. Rosenblatt,et al.  Economic Production Cycles with Imperfect Production Processes , 1986 .

[32]  Singa Wang Chiu,et al.  Optimizing replenishment policy in an EPQ-based inventory model with nonconforming items and breakdown , 2013 .

[33]  M. N. Gopalan,et al.  Expected Duration Analysis of a Two-Stage Transfer-Line Production System Subject to Inspection and Rework , 1994 .

[34]  Yuan-Shyi Peter Chiu,et al.  Replenishment run time problem with machine breakdown and failure in rework , 2012, Expert Syst. Appl..