Examining the Performance Level of Project Management Competencies of Architects in Ghana Using Gap Analysis Approach

Evaluation of the performance level of key project management (PM) competencies of the various project teams is perceived as a recourse necessary for identifying potentially crucial and practical training needs of project team participants in PM practice. However, notable studies in this domain have primarily focused on the identification of critical PM competencies of project managers and engineers of the project team neglecting the architect who are equally important participants of construction project teams. This study focused on assessing the performance level of the critical PM competencies of the architect as a key team participant in project delivery. A quantitative method design was adopted involving a structured questionnaire survey of Ghanaian construction professionals who were selected through snow balling sampling. The data elicited were analysed using mean scores, Kruskal-Wallis test and gap analysis. The findings revealed that, architects show worse performance on seven critical competencies. The practical implication of the findings is that the disposition of architects PM behaviours can be ascertained as this can lend credence to legitimising corrective action through any potential continuing professional development programme and training in PM for architects in the Ghanaian construction industry.

[1]  Martin Skitmore,et al.  Determinants of contractor satisfaction , 2013 .

[2]  Qiping Shen,et al.  Critical Success Factors for Value Management Studies in Construction , 2003 .

[3]  D. Proverbs,et al.  A COMPARISON OF CONTRACTOR PERFORMANCE IN JAPAN , THE UK AND THE US : SOME PRELIMINARY FINDINGS FROM A NEW APPROACH , 2004 .

[4]  G. Rose,et al.  A test of the validity of Hofstede's cultural framework , 2008 .

[5]  Sherif Ali Mohtady Mohamed,et al.  Factors affecting the performance of construction projects in the Gaza Strip , 2009 .

[6]  Yean Yng Ling,et al.  A conceptual model for selection of architects by project managers in Singapore , 2003 .

[7]  Nurhidayah Azmy,et al.  The Role of Team Effectiveness in Construction Project Teams and Project Performance , 2012 .

[8]  Stefan Frans Bothma Developing project management competencies in graduate engineers in the construction industry , 2013 .

[9]  E. Westerveld,et al.  The Project Excellence Model®: linking success criteria and critical success factors , 2003 .

[10]  Charles O. Skipper,et al.  Leadership Development and Succession Planning , 2008 .

[11]  Lauri Koskela,et al.  Design management in building construction: from theory to practice , 2002 .

[12]  Paul Chinowsky,et al.  Social Network Model of Construction , 2008 .

[13]  Frank Fugar,et al.  Delays in Building Construction Projects in Ghana , 2010 .

[14]  Pantaleo Mutajwaa Daniel Rwelamila,et al.  CONSTRUCTION PROJECT MANAGEMENT EDUCATION PROGRAMMES IN SOUTH AFRICA - ADDRESSING THE GAP , 2007 .

[15]  Robert J. Harvey,et al.  Benchmarking rWG Interrater Agreement Indices: Let's Drop the .70 Rule-Of-Thumb , 2004 .

[16]  Fotis Draganidis An Ontology Based Tool for Competency Management and Learning Paths , 2006 .

[17]  Xiao Hong A comparative study of contractor performance based on Japanese, UK and US construction practice , 2002 .

[18]  Lukumon O. Oyedele,et al.  Model for Predicting Architect's Performance in Building Delivery Process , 2003 .

[19]  Andrew R.J. Dainty,et al.  A competency‐based performance model for construction project managers , 2004 .

[20]  Titus Ebenezer Kwofie,et al.  Identification of the critical project management competencies of architects in the Ghanaian construction industry , 2015 .

[21]  Aminah Robinson Fayek,et al.  Organizational Competencies and Project Performance Tool (OCPPT©): Evaluating Construction Project Competencies and Performance , 2016 .

[22]  Stephen Emmitt,et al.  Communication behaviour during management and design team meetings: a comparison of group interaction , 2007 .

[23]  Inbal Nahum-Shani,et al.  Testing Agreement for Multi-Item Scales With the IndicesrWG(J) and AD M(J) , 2009 .

[24]  William K. Balzer,et al.  Relationship between observational accuracy and accuracy in evaluating performance. , 1982 .

[25]  De-Graft Owusu-Manu,et al.  A Principal Component Analysis of Project Management Competencies for the Ghanaian Construction Industry , 2011 .

[26]  Francis Tekyi Edum-Fotwe,et al.  Developing project management competency: perspectives from the construction industry , 2000 .

[27]  Joseph,et al.  Delays to Large Construction Projects in Ghana: A Risk Overview , 2014 .

[28]  Acta Morphologica Generalis,et al.  Morphological Gap-Analysis Using GMA to find the , 2013 .

[29]  J. Ambrus,et al.  Critical evaluation. , 1965, The Wistar Institute symposium monograph.

[30]  Andrew R.J. Dainty,et al.  The extent of team integration within construction projects , 2006 .

[31]  Juan I. Sanchez,et al.  What is (or should be) the difference between competency modeling and traditional job analysis , 2009 .

[32]  Lynn Crawford,et al.  Senior management perceptions of project management competence , 2005 .

[33]  K. T. Odusami,et al.  Perceptions of Construction Professionals Concerning Important Skills of Effective Project Leaders , 2002 .

[34]  Edmundas Kazimieras Zavadskas,et al.  SELECTION OF CONSTRUCTION PROJECT MANAGERS BY APPLYING COPRAS-G METHOD , 2008 .

[35]  Damilola Ekundayo,et al.  Construction professionals and project management competencies in Nigeria , 2008 .

[36]  Zulkiflee Bin Abdul Samad,et al.  Critical evaluation of project manager's competency standard for proposing a comprehensive model , 2011 .

[37]  A. Field Discovering statistics using SPSS for Windows. , 2000 .

[38]  Albert P.C. Chan,et al.  Factors Affecting the Success of a Construction Project , 2004 .

[39]  Asrul Nasid Masrom,et al.  Examining the influence of participant performance factors on contractor satisfaction : a structural equation model , 2013 .

[40]  Peter E.D. Love,et al.  Quantifying the causes and costs of rework in construction , 2000 .

[41]  Amm Liu,et al.  Research Methods for Construction (3rd ed.) , 2008 .

[42]  Michael Murray,et al.  Communication in Construction: Theory and Practice , 2006 .

[43]  Andrew M. Civitello Contractor's guide to change orders : the art of finding, pricing, and getting paid for contract changes and the damages they cause , 1987 .

[44]  Will Hughes,et al.  Building Design Management , 2001 .

[45]  P. Argenti,et al.  How Corporate Communication Influences Strategy Implementation, Reputation and the Corporate Brand: An Exploratory Qualitative Study , 2005 .

[46]  Karen A. Brown,et al.  Developing Project Management Skills: A Service Learning Approach , 2000 .

[47]  D. K.. Ahadzie,et al.  MANAGEMENT PRACTICES IN THE GHANAIAN HOUSE BUILDING INDUSTRY , 2010 .

[48]  Zarina Alias,et al.  Determining Critical Success Factors of Project Management Practice: A Conceptual Framework☆ , 2014 .

[49]  C. Bowman,et al.  Implementing strategy through projects , 1994 .

[50]  Mohammadreza Yadollahi,et al.  Architect Critical Challenges as a Project Manager in Construction Projects: A Case Study , 2014 .

[51]  Paul. Olomolaiye,et al.  Competencies required by project managers for housing construction in Ghana , 2009 .

[52]  Charles Egbu,et al.  The significance of human resource issues in knowledge management within the construction industry - people, problems and possibilities , 2004 .

[53]  Martin Skitmore,et al.  Investigating the impact of project definition clarity on project performance: Structural equation modeling study , 2015 .

[54]  D. K.. Ahadzie,et al.  Competencies required of project managers at the design phase of mass house building projects , 2014 .