Inspection and maintenance of oil & gas pipelines: a review of policies

Abstract Oil and gas (O&G) pipelines are expensive assets that cross through both the ecologically sensitive and densely populated urban areas. The pipeline failure may have potentially significant consequences for both the natural and human environments. In order to maintain the integrity of O&G pipelines, inspection and maintenance processes should be governed by efficient policies. The objective of this paper is to conduct a state-of-the-art review of maintenance policies of O&G pipelines to investigate their advantages, limitations, and associated implementation issues. Maintenance policies can be categorised into corrective, preventive, predictive and proactive. Corrective maintenance policies (1940s) were based on the ‘repair when broke’ philosophy. Economic considerations shifted practice towards preventive maintenance (1970s to 1990s); later with improved inspection techniques and environmental regulations, predictive and proactive or risk-based maintenance (RBM) policies were developed. This review explicates different methodologies for RBM and related issues, e.g. uncertainties and variability, conservative assumptions, etc. Uncertainties associated with investigation and prediction of defects have been more frequently reported in the literature so far. Moreover, existing studies primarily focused on reducing the likelihood and cost of failure, whereas consideration of environmental factors in overall risk has been a relatively less addressed issue.

[1]  J. P. Brill,et al.  Stratified three phase flow in pipes , 1995 .

[2]  John Dalsgaard Sørensen,et al.  Risk-based inspection planning optimisation of offshore wind turbines , 2012 .

[3]  Dan M. Frangopol,et al.  Bridge network performance, maintenance and optimisation under uncertainty: accomplishments and challenges , 2012, Structures and Infrastructure Systems.

[4]  R.C. Wilcox,et al.  Uncertainty modeling of data and uncertainty propagation for risk studies , 2003, Fourth International Symposium on Uncertainty Modeling and Analysis, 2003. ISUMA 2003..

[5]  Charles E Ebeling,et al.  An Introduction to Reliability and Maintainability Engineering , 1996 .

[6]  Rae Zimmerman,et al.  Risk management of cost consequences in natural gas transmission and distribution infrastructures , 2010 .

[7]  T Breton,et al.  Identification of failure type in corroded pipelines: a bayesian probabilistic approach. , 2010, Journal of hazardous materials.

[8]  P Hopkins,et al.  Best practice for the assessment of defects in pipelines – Corrosion , 2007 .

[9]  Kailas C. Sahu,et al.  Preventive Maintenance Interval for Optimal Reliability of Deteriorating System , 1977, IEEE Transactions on Reliability.

[10]  Toly Chen,et al.  A fuzzy set approach for event tree analysis , 2001, Fuzzy Sets Syst..

[11]  Dan M. Frangopol,et al.  Bridge Network Maintenance Optimization Using Stochastic Dynamic Programming , 2007 .

[12]  Dan M. Frangopol,et al.  Generalized Probabilistic Framework for Optimum Inspection and Maintenance Planning , 2013 .

[13]  N. A. J. Hastings,et al.  An Economic Replacement Model , 1967 .

[14]  Toshio Nishida,et al.  OPTIMAL REPLACEMENT POLICY FOR MINIMAL REPAIR MODEL , 1975 .

[15]  Faisal Khan,et al.  Risk analysis of a typical chemical industry using ORA procedure , 2001 .

[16]  Robert Y. Liang,et al.  A clustering approach for assessing external corrosion in a buried pipeline based on hidden Markov random field model , 2015 .

[17]  Inmaculada Torres Castro,et al.  An optimal maintenance policy for repairable systems with delayed repairs , 2008, Oper. Res. Lett..

[18]  Alex W. Dawotola,et al.  Risk-Based Maintenance of a Cross-Country Petroleum Pipeline System , 2013 .

[19]  Faisal Khan,et al.  Risk based asset integrity indicators , 2012 .

[20]  Solomon Tesfamariam,et al.  Risk analysis for oil & gas pipelines: A sustainability assessment approach using fuzzy based bow-tie analysis , 2012 .

[21]  Viliam Makis,et al.  A replacement model with overhauls and repairs , 1995 .

[22]  Hoang Pham,et al.  Some maintenance models and availability withimperfect maintenance in production systems , 1999, Ann. Oper. Res..

[23]  Tadashi Dohi,et al.  GRAPHICAL/STATISTICAL APPROACH TO REPAIR LIMIT REPLACEMENT PROBLEM , 1996 .

[24]  Z Y Han,et al.  Comparison study on qualitative and quantitative risk assessment methods for urban natural gas pipeline network. , 2011, Journal of hazardous materials.

[25]  Ilya B. Gertsbakh,et al.  Models of Preventive Maintenance , 1977 .

[26]  Toshiro Tango,et al.  Extended block replacement policy with used items , 1978, Journal of Applied Probability.

[27]  B. Bergman Optimal replacement under a general failure model , 1978, Advances in Applied Probability.

[28]  Thomas L. Saaty,et al.  DECISION MAKING WITH THE ANALYTIC HIERARCHY PROCESS , 2008 .

[29]  Frank Beichelt,et al.  A Replacement Policy Based on Limits for the Repair Cost Rate , 1982, IEEE Transactions on Reliability.

[31]  M R Miri Lavasani,et al.  Application of Fuzzy Fault Tree Analysis on Oil and Gas Offshore Pipelines , 2011 .

[32]  Basim Al-Najjar Condition-Based Maintenance: Selection and Improvement of a Cost-Effective Vibration-Based Maintenance Policy for Rolling element Bearings , 1997 .

[33]  R. Barlow,et al.  Optimum Preventive Maintenance Policies , 1960 .

[34]  Dong Yuhua,et al.  Estimation of failure probability of oil and gas transmission pipelines by fuzzy fault tree analysis , 2005 .

[35]  Prasanta Kumar Dey,et al.  Decision support system for inspection and maintenance: a case study of oil pipelines , 2004, IEEE Transactions on Engineering Management.

[36]  John E. Renaud,et al.  Uncertainty quantification using evidence theory in multidisciplinary design optimization , 2004, Reliab. Eng. Syst. Saf..

[37]  Joseph Mathew,et al.  Engineering Asset Management , 2006 .

[38]  T. Nakagawa Optimal policy of continuous and discrete replacement with minimal repair at failure , 1984 .

[39]  Solomon Tesfamariam,et al.  A review of multi-criteria decision-making methods for infrastructure management , 2014 .

[40]  D. N. P. Murthy,et al.  Optimal Repair Limit Replacement Policies with Imperfect Repair , 1981 .

[41]  Ron S. Kenett,et al.  The 5C model: A new approach to asset integrity management , 2010 .

[42]  Toshio Nakagawa A SUMMARY OF PERIODIC REPLACEMENT WITH MINIMAL REPAIR AT FAILURE , 1981 .

[43]  George J. Klir,et al.  Uncertainty Modeling and Analysis in Engineering and the Sciences (Hardcover) , 2006 .

[44]  Mahesh D. Pandey,et al.  Estimation of parameters of degradation growth rate distribution from noisy measurement data , 2013 .

[45]  Dan M. Frangopol,et al.  Maintenance, management, life-cycle design and performance of structures and infrastructures: a brief review , 2012 .

[46]  Art Hodgdon,et al.  Pipeline integrity assessment and management , 2005 .

[47]  Enrico Cagno,et al.  Using AHP in determining the prior distributions on gas pipeline failures in a robust Bayesian approach , 2000, Reliab. Eng. Syst. Saf..

[48]  Kari Sentz,et al.  Combination of Evidence in Dempster-Shafer Theory , 2002 .

[49]  Robert Y. Liang,et al.  A Bayesian model framework for calibrating ultrasonic in-line inspection data and estimating actual external corrosion depth in buried pipeline utilizing a clustering technique , 2015 .

[50]  Maneesh Kumar Singh,et al.  Handling of variability in probabilistic and possibilistic failure analysis of corroded pipes , 2014, Int. J. Syst. Assur. Eng. Manag..

[51]  Shunji Osaki,et al.  Nonparametric repair-limit replacement policies with imperfect repair , 1997 .

[52]  F. Caleyo,et al.  Markov chain modelling of pitting corrosion in underground pipelines , 2009 .

[53]  L. Yeh A note on the optimal replacement problem , 1988, Advances in Applied Probability.

[54]  Hidenori Morimura,et al.  ON SOME PREVENTIVE MAINTENANCE POLICIES , 1963 .

[55]  Prasanta Kumar Dey,et al.  Analytic Hierarchy Process Analyzes Risk of Operating Cross-Country Petroleum Pipelines in India , 2003 .

[56]  J Maiti,et al.  Risk-based maintenance--techniques and applications. , 2007, Journal of hazardous materials.

[57]  Rehan Sadiq,et al.  Predicting risk of water quality failures in distribution networks under uncertainties using fault-tree analysis , 2008 .

[58]  Abdul Raouf,et al.  Planning and Control of Maintenance Systems: Modeling and Analysis , 1998 .

[59]  Dan M. Frangopol,et al.  Probabilistic bicriterion optimum inspection/monitoring planning: applications to naval ships and bridges under fatigue , 2011, Structures and Infrastructure Systems.

[60]  Norhazilan Md Noor,et al.  Deterministic prediction of corroding pipeline remaining strength in marine environment using DNV RP–F101 (Part A) , 2011 .

[61]  Jianfeng Li,et al.  An evaluation of maintenance strategy using risk based inspection , 2011 .

[62]  Richard M. Feldman,et al.  A survey of preventive maintenance models for stochastically deteriorating single-unit systems , 1989 .

[63]  M.Carmen Carnero Moya The control of the setting up of a predictive maintenance programme using a system of indicators , 2004 .

[64]  Bilal M. Ayyub,et al.  Systems framework for fuzzy sets in civil engineering , 1991 .

[65]  Maneesh Singh,et al.  A methodology for risk-based inspection planning of oil and gas pipes based on fuzzy logic framework , 2009 .

[66]  María Carmen Carnero Selection of diagnostic techniques and instrumentation in a predictive maintenance program. A case study , 2005 .

[67]  Hans Löfsten Management of industrial maintenance – economic evaluation of maintenance policies , 1999 .

[68]  Lin Ma,et al.  A grouping model for distributed pipeline assets maintenance decision , 2011, 2011 International Conference on Quality, Reliability, Risk, Maintenance, and Safety Engineering.

[69]  Pascal Le Gauffre,et al.  Benefits of using basic, imprecise or uncertain data for elaborating sewer inspection programmes , 2015 .

[70]  John S. Usher,et al.  Cost optimal preventive maintenance and replacement scheduling , 1998 .

[71]  G A Papadakis Assessment of requirements on safety management systems in EU regulations for the control of major hazard pipelines. , 2000, Journal of hazardous materials.

[72]  T. Nakagawa Periodic and sequential preventive maintenance policies , 1986 .

[73]  M. Ahammed,et al.  Probabilistic estimation of remaining life of a pipeline in the presence of active corrosion defects , 1998 .

[74]  Salih O. Duffuaa,et al.  A generic conceptual simulation model for maintenance systems , 2001 .

[75]  Toshio Nakagawa,et al.  Modified Periodic Replacement with Minimal Repair at Failure , 1981, IEEE Transactions on Reliability.

[76]  P. K. Kapur,et al.  Some replacement policies with minimal repairs and repair cost limit , 1989 .

[77]  R. Mora,et al.  Obtaining Corrosion Growth Rates From Repeat In-Line Inspection Runs and Dealing With the Measurement Uncertainties , 2008 .

[78]  Peter Söderholm,et al.  Selection of maintenance actions using the analytic hierarchy process (AHP): decision-making in railway infrastructure , 2010 .

[79]  In-Jae Jeong,et al.  Integrated decision-support system for diagnosis, maintenance planning, and scheduling of manufacturing systems , 2007 .

[80]  Daming Lin,et al.  A review on machinery diagnostics and prognostics implementing condition-based maintenance , 2006 .

[81]  Joe Zhou,et al.  Reliability-Based Design and Assessment Standards for Onshore Natural Gas Transmission Pipelines , 2009 .

[82]  T. Nakagawa A summary of imperfect preventive maintenance policies with minimal repair , 1980 .

[83]  Aparna Gupta,et al.  Strategically optimum maintenance of monitoring‐enabled multi‐component systems using continuous‐time jump deterioration models , 2006 .

[84]  Hossam A. Gabbar,et al.  Review of pipeline integrity management practices , 2010 .

[85]  Tarek Zayed,et al.  Condition Prediction Models for Oil and Gas Pipelines Using Regression Analysis , 2014 .

[86]  Vijay P. Singh,et al.  Risk and reliability analysis , 2007 .

[87]  André T. Beck,et al.  Optimal inspection and design of onshore pipelines under external corrosion process , 2014 .

[88]  J. S. Dagpunar,et al.  Preventative maintenance strategy for equipment under warranty , 1994 .

[89]  Adiel Teixeira de Almeida,et al.  A multicriteria model for risk sorting of natural gas pipelines based on ELECTRE TRI integrating Utility Theory , 2010, Eur. J. Oper. Res..

[90]  T. Nakagawa,et al.  Extended optimal replacement model with random minimal repair costs , 1995 .

[91]  Brian Veitch,et al.  Fault and Event Tree Analyses for Process Systems Risk Analysis: Uncertainty Handling Formulations , 2011, Risk analysis : an official publication of the Society for Risk Analysis.

[92]  T. Nakagawa Sequential imperfect preventive maintenance policies , 1988 .

[93]  Mahesh D. Pandey,et al.  Probabilistic models for condition assessment of oil and gas pipelines , 1998 .

[94]  Faisal Khan,et al.  Risk-based maintenance (RBM): a quantitative approach for maintenance/inspection scheduling and planning , 2003 .

[95]  T. Saaty How to Make a Decision: The Analytic Hierarchy Process , 1990 .

[96]  H. Pham,et al.  Invited reviewImperfect maintenance , 1996 .

[97]  Stephen O. Ogunlana,et al.  Risk‐based maintenance model for offshore oil and gas pipelines: a case study , 2004 .

[98]  J. E. Cockshott Probability Bow-Ties: A Transparent Risk Management Tool , 2005 .

[99]  Balbir S. Dhillon,et al.  Engineering Maintenance: A Modern Approach , 2002 .

[100]  Sadi Assaf,et al.  Risk-Based Maintenance Planning of Cross-Country Pipelines , 2005 .

[101]  Tarek Zayed,et al.  Condition-based maintenance decision support system for oil and gas pipelines , 2015 .

[102]  Guru Kulandaivel,et al.  Pipeline Condition Prediction Using Neural Network Models , 2005 .

[103]  Prasanta Kumar Dey,et al.  A risk‐based model for inspection and maintenance of cross‐country petroleum pipeline , 2001 .

[104]  G. Sigurdsson,et al.  Introduction and background to DNV RP-F101 Corroded Pipelines , 1999 .

[105]  Wenxing Zhou,et al.  Reliability Based Design and Assessment for Location-Specific Failure Threats With Application to Natural Gas Pipelines , 2009 .

[106]  Cécile Fiévez,et al.  ARAMIS project: a more explicit demonstration of risk control through the use of bow-tie diagrams and the evaluation of safety barrier performance. , 2006, Journal of hazardous materials.

[107]  Woohyun Kim,et al.  On determination of the preventive maintenance interval guaranteeing system availability under a periodic maintenance policy , 2011 .

[108]  J. Deng,et al.  Introduction to Grey system theory , 1989 .

[109]  Shahrul Kamaruddin,et al.  An overview of time-based and condition-based maintenance in industrial application , 2012, Comput. Ind. Eng..

[110]  Mats Jackson,et al.  A survey on condition monitoring systems in industry , 2004 .

[111]  Anne Jerneck,et al.  Structuring sustainability science , 2011 .

[112]  Mitsuo Kawatani,et al.  Modal parameter identification of short span bridges under a moving vehicle by means of multivariate AR model , 2012 .

[113]  Enrico Zio,et al.  Some considerations on the treatment of uncertainties in risk assessment for practical decision making , 2011, Reliab. Eng. Syst. Saf..

[114]  Y. H. Chun,et al.  Optimal number of periodic preventive maintenance operations under warranty , 1992 .

[115]  Toshio Nakagawa,et al.  Replacement policies of a shock model with imperfect preventive maintenance , 1992 .

[116]  Aditya Parida,et al.  Preventive and corrective maintenance – cost comparison and cost–benefit analysis , 2016 .

[117]  Richard C.M. Yam,et al.  Intelligent Predictive Decision Support System for Condition-Based Maintenance , 2001 .

[118]  Larry Rankin Pipeline integrity information integration , 2004 .

[119]  G. M. Makhviladze,et al.  Statistical analysis of accidents on the Middle Asia-Centre gas pipelines , 1996 .

[120]  Viliam Makis,et al.  Optimal replacement of a system with imperfect repair , 1991 .

[121]  Basim Al-Najjar Condition-based maintenance : Selection and improvement of a cost-effective vibration-based policy in rolling element bearings , 1997 .

[122]  Gary E. Newell Oil analysis cost‐effective machine condition monitoring technique , 1999 .

[123]  Francisco Caleyo,et al.  Probabilistic Condition Assessment of Corroding Pipelines in Mexico , 2003 .

[124]  Lin Ma,et al.  Group Maintenance Scheduling: A Case Study for a Pipeline Network , 2014 .

[125]  Uday Kumar,et al.  Maintenance analysis for continuous improvement of railway infrastructure performance , 2015 .

[126]  Naftali A. Langberg,et al.  Repair replacement policies , 1993, Journal of Applied Probability.

[127]  Nii O. Attoh-Okine,et al.  Novel Approach in Pipe Condition Scoring , 2011 .

[128]  Singiresu S Rao,et al.  Fault tree analysis of fuzzy mechanical systems , 1994 .

[129]  Brian Veitch,et al.  Handling data uncertainties in event tree analysis , 2009 .

[130]  Young-Do Jo,et al.  Individual risk analysis of high-pressure natural gas pipelines , 2008 .

[131]  Qingshan Feng,et al.  Probabilistic Assessment of External Corrosion Rates in Buried Oil and Gas Pipelines , 2015 .

[132]  E. Zio,et al.  Prognostics and Health Management of Industrial Equipment , 2013 .

[133]  Hidenori Morimura,et al.  On some preventive maintenance polices for IFR , 1969 .

[134]  Toshio Nakagawa,et al.  The Optimum Repair Limit Replacement Policies , 1974 .

[135]  John W. H. Price,et al.  Optimal maintenance intervals for a multi-component system , 2006 .

[136]  Albert H. C. Tsang,et al.  Condition-based maintenance: tools and decision making , 1995 .

[137]  Dan M. Frangopol,et al.  Maintenance and safety of aging infrastructure , 2014 .

[138]  Thomas L. Saaty,et al.  Decision making with dependence and feedback : the analytic network process : the organization and prioritization of complexity , 1996 .

[139]  Adam S. Markowski,et al.  Fuzzy logic for process safety analysis , 2009 .

[140]  Antoine Grall,et al.  A condition-based maintenance policy for stochastically deteriorating systems , 2002, Reliab. Eng. Syst. Saf..

[141]  Faisal Khan,et al.  Risk-Based Inspection and Maintenance (RBIM): Multi-Attribute Decision-Making with Aggregative Risk Analysis , 2004 .

[142]  Alaa Chateauneuf,et al.  Maintenance planning under imperfect inspections of corroded pipelines , 2013 .

[143]  J. Moubray Reliability-centred maintenance , 1995 .

[144]  Chinedu I. Ossai,et al.  Estimation of internal pit depth growth and reliability of aged oil and gas pipelines: A Monte Carlo simulation approach , 2015 .

[145]  R. Revie,et al.  Model to Predict Internal Pitting Corrosion of Oil and Gas Pipelines , 2010 .

[146]  Amr S. Elnashai,et al.  Uncertainties in life-cycle analysis and design of structures and infrastructures , 2011 .

[147]  Wolfgang Stadje,et al.  Optimal strategies for some repair replacement models , 1990 .

[148]  Nijs Jan Duijm,et al.  Safety-barrier diagrams as a safety management tool , 2009, Reliab. Eng. Syst. Saf..

[149]  Ashraf Labib,et al.  A decision analysis model for maintenance policy selection using a CMMS , 2004 .

[150]  Kyung S. Park Optimal Number of Minimal Repairs before Replacement , 1979, IEEE Transactions on Reliability.

[151]  Maneesh Kumar Singh,et al.  Simultaneous handling of variability and uncertainty in probabilistic and possibilistic failure analysis of corroded pipes , 2014, Int. J. Syst. Assur. Eng. Manag..

[152]  Viliam Makis,et al.  A note on optimal replacement policy under general repair , 1993 .

[153]  T. G. Edwards,et al.  Smart sensors and system health management tools for avionics and mechanical systems , 1997, 16th DASC. AIAA/IEEE Digital Avionics Systems Conference. Reflections to the Future. Proceedings.

[154]  Menachem Berg,et al.  A modified block replacement policy , 1976 .

[155]  Ren-Rong Chang,et al.  Application of risk based inspection in refinery and processing piping , 2005 .

[156]  N. S. Arunraj,et al.  Risk-based maintenance policy selection using AHP and goal programming. , 2010 .

[157]  William L. Leffler,et al.  Oil & Gas Pipelines in Nontechnical Language , 2006 .

[158]  Young Ho Chun,et al.  An Algorithm for Preventive Maintenance Policy , 1986, IEEE Transactions on Reliability.

[159]  Joe Zhou,et al.  Application of Reliability Based Design and Assessment to Maintenance and Protection Decisions for Natural Gas Pipelines , 2010 .

[160]  Do Sun Bai,et al.  Repair cost limit replacement policy under imperfect inspection , 1988 .

[161]  Ernest W. Klechka Pipeline integrity management and corrosion control , 2002 .

[162]  Torgeir Moan Reliability-based management of inspection, maintenance and repair of offshore structures , 2005 .

[163]  Dan M. Frangopol,et al.  Maintenance and management of civil infrastructure based on condition, safety, optimization, and life-cycle cost* , 2007 .

[164]  Young-Do Jo,et al.  A method of quantitative risk assessment for transmission pipeline carrying natural gas. , 2005, Journal of hazardous materials.

[165]  Hongzhou Wang,et al.  A survey of maintenance policies of deteriorating systems , 2002, Eur. J. Oper. Res..

[166]  Chris Chapman,et al.  Project risk analysis and management - PRAM the generic process , 1997 .

[167]  Ramana V. Grandhi,et al.  An approximation approach for uncertainty quantification using evidence theory , 2004, Reliab. Eng. Syst. Saf..

[168]  Shiaw-Wen Tien,et al.  Study of a risk-based piping inspection guideline system. , 2007, ISA transactions.

[169]  Hong-Zhong Huang,et al.  An optimal sequential preventive maintenance policy under stochastic maintenance quality , 2011 .

[170]  Alex W. Dawotola,et al.  Risk Assessment of Petroleum Pipelines using a com- bined Analytical Hierarchy Process - Fault Tree Analysis (AHP-FTA) , 2009 .

[171]  Maneesh Singh,et al.  Hybrid models for handling variability and uncertainty in probabilistic and possibilistic failure analysis of corroded pipes , 2014 .