Do Planners Get it Right? : The Accuracy of Travel Demand Forecasting in Norway

This paper deals with the accuracy of travel demand forecasts among Norwegian road projects. We use data collected from tolled roads and toll free roads. The results reveal that while traffic forecasts of tolled schemes are fairly accurate, traffic forecasts among toll free roads have a higher degree of inaccuracy and are generally underestimated. An explanation for the observed discrepancy between estimated and actual traffic among toll free roads is that road planners may have ignored the existence of induced traffic and that the standard national traffic growth rates used in the transport models has been too low. For tolled roads, an explanation for the higher degree of forecast accuracy is that planners over the years have been scrutinized to provide careful estimates. Our recommendation is that traffic forecasts provided by planners should constantly be subjected to scrutiny by independent consultants before being presented to the decision makers. Aspects that need to be specifically examined include: (1) the extent to which a road project may lead to induced traffic, (2) the extent to which transport models accommodate appropriate factors and, (3) the extent to which forecasts made address uncertainties by providing confidence intervals of estimates.

[1]  R. H. Muller EXAMINING TOLL ROAD FEASIBILITY STUDIES , 1996 .

[2]  R. Bain Error and optimism bias in toll road traffic forecasts , 2009 .

[3]  A Boyce,et al.  Reducing or managing the forecasting risk in privately-financed projects , 2003 .

[4]  R. Bain,et al.  Traffic forecasting risk: study update 2004 , 2004 .

[5]  J. Odeck,et al.  The efficiency of Norwegian road toll companies , 2011 .

[6]  Andrew Daly,et al.  Uncertainty in traffic forecasts: literature review and new results for The Netherlands , 2007 .

[7]  James Odeck,et al.  Ranking of regional road investment in Norway , 1996 .

[8]  Søren L. Buhl,et al.  Do Road Planners Produce More ‘Honest Numbers’ than Rail Planners? An Analysis of Accuracy in Road‐traffic Forecasts in Cities versus Peripheral Regions , 2006 .

[9]  Søren L. Buhl,et al.  Inaccuracy in Traffic Forecasts , 2006 .

[10]  R. Noland,et al.  Building new roads really does create extra traffic: a response to Prakash et al. , 2003 .

[11]  Bent Flyvbjerg,et al.  Policy and Planning for Large-Infrastructure Projects: Problems, Causes, Cures , 2005, 1303.7400.

[12]  James Odeck,et al.  Cost overruns in road construction--what are their sizes and determinants? , 2004 .

[13]  James Odeck What Determines Decision‐Makers’ Preferences for Road Investments? Evidence from the Norwegian Road Sector , 2010 .

[14]  R Bain,et al.  Traffic forecasting risk study update 2005: through ramp-up and beyond , 2005 .

[15]  Martin Wachs,et al.  Forecasts in urban transportation planning: Uses, methods, and dilemmas , 1987 .

[16]  R Bain Toll road traffic and revenue forecasts - an interpreter's guide , 2009 .

[17]  B. Flyvbjerg Measuring Inaccuracy in Travel Demand Forecasting: Methodological Considerations Regarding Ramp Up and Sampling , 2005, 1303.7401.

[18]  Phil. Goodwin,et al.  Empirical evidence on induced traffic , 1996 .

[19]  Oddgeir Osland,et al.  The Politics and Institutions of Project Approval - a Critical-Constructive Comment on the Theory of Strategic Misrepresentation , 2010, European Journal of Transport and Infrastructure Research.

[20]  A Kjerkreit,et al.  The accuracy of ex-ante benefit cost analysis – a post opening evaluation in the case of Norwegian road projects , 2009 .

[21]  Jan-Eric Nilsson INVESTMENT DECISIONS IN A PUBLIC BUREAUCRACY: A CASE STUDY OF SWEDISH ROAD PLANNING PRACTICES , 1991 .

[22]  Søren L. Buhl,et al.  How (In)accurate Are Demand Forecasts in Public Works Projects?: The Case of Transportation , 2005, 1303.6654.