Do Planners Get it Right? : The Accuracy of Travel Demand Forecasting in Norway
暂无分享,去创建一个
[1] R. H. Muller. EXAMINING TOLL ROAD FEASIBILITY STUDIES , 1996 .
[2] R. Bain. Error and optimism bias in toll road traffic forecasts , 2009 .
[3] A Boyce,et al. Reducing or managing the forecasting risk in privately-financed projects , 2003 .
[4] R. Bain,et al. Traffic forecasting risk: study update 2004 , 2004 .
[5] J. Odeck,et al. The efficiency of Norwegian road toll companies , 2011 .
[6] Andrew Daly,et al. Uncertainty in traffic forecasts: literature review and new results for The Netherlands , 2007 .
[7] James Odeck,et al. Ranking of regional road investment in Norway , 1996 .
[8] Søren L. Buhl,et al. Do Road Planners Produce More ‘Honest Numbers’ than Rail Planners? An Analysis of Accuracy in Road‐traffic Forecasts in Cities versus Peripheral Regions , 2006 .
[9] Søren L. Buhl,et al. Inaccuracy in Traffic Forecasts , 2006 .
[10] R. Noland,et al. Building new roads really does create extra traffic: a response to Prakash et al. , 2003 .
[11] Bent Flyvbjerg,et al. Policy and Planning for Large-Infrastructure Projects: Problems, Causes, Cures , 2005, 1303.7400.
[12] James Odeck,et al. Cost overruns in road construction--what are their sizes and determinants? , 2004 .
[13] James Odeck. What Determines Decision‐Makers’ Preferences for Road Investments? Evidence from the Norwegian Road Sector , 2010 .
[14] R Bain,et al. Traffic forecasting risk study update 2005: through ramp-up and beyond , 2005 .
[15] Martin Wachs,et al. Forecasts in urban transportation planning: Uses, methods, and dilemmas , 1987 .
[16] R Bain. Toll road traffic and revenue forecasts - an interpreter's guide , 2009 .
[17] B. Flyvbjerg. Measuring Inaccuracy in Travel Demand Forecasting: Methodological Considerations Regarding Ramp Up and Sampling , 2005, 1303.7401.
[18] Phil. Goodwin,et al. Empirical evidence on induced traffic , 1996 .
[19] Oddgeir Osland,et al. The Politics and Institutions of Project Approval - a Critical-Constructive Comment on the Theory of Strategic Misrepresentation , 2010, European Journal of Transport and Infrastructure Research.
[20] A Kjerkreit,et al. The accuracy of ex-ante benefit cost analysis – a post opening evaluation in the case of Norwegian road projects , 2009 .
[21] Jan-Eric Nilsson. INVESTMENT DECISIONS IN A PUBLIC BUREAUCRACY: A CASE STUDY OF SWEDISH ROAD PLANNING PRACTICES , 1991 .
[22] Søren L. Buhl,et al. How (In)accurate Are Demand Forecasts in Public Works Projects?: The Case of Transportation , 2005, 1303.6654.