Analytical Evaluation of Hierarchical Planning Systems
暂无分享,去创建一个
B. J. Lageweg | Jan Karel Lenstra | Alexander H. G. Rinnooy Kan | L. Jansen | Michael A. H. Dempster | M. L. Fisher | M. Fisher | M. Dempster | J. Lenstra | A. Kan | B. Lageweg | L. Jansen
[1] Thomas L. Magnanti,et al. Applied Mathematical Programming , 1977 .
[2] Bruce L. Golden,et al. A Framework For Probabilistic Vehicle Routing , 1979 .
[3] Arnoldo C. Hax,et al. Hierarchical integration of production planning and scheduling , 1973 .
[4] B. J. Lageweg,et al. Hierarchical distribution modelling with routing costs : (preprint) , 1980 .
[5] Fred Glover,et al. An Integrated Production, Distribution, and Inventory Planning System , 1979 .
[6] Jaikumar Ramchandran,et al. An operational optimization procedure for production scheduling , 1974, Comput. Oper. Res..
[7] Marshall L. Fisher,et al. A generalized assignment heuristic for vehicle routing , 1981, Networks.
[8] B. J. Lageweg,et al. Analysis of Heuristics for Stochastic Programming: Results for Hierarchical Scheduling Problems , 1983, Math. Oper. Res..
[9] Gabriel R. Bitran,et al. ON THE DESIGN OF HIERARCHICAL PRODUCTION PLANNING SYSTEMS , 1977 .
[10] M. Fisher. Worst-Case Analysis of Heuristic Algorithms , 1980 .
[11] Arnoldo C. Hax,et al. Hierarchical Production Planning Systems. , 1977 .
[12] Arnoldo C. Hax,et al. A Hierarchical Approach for a Naval Tender Job Shop Design. , 1974 .