[1] Iris D. Tommelein,et al. More Just-in-Time: Location of Buffers in Structural Steel Supply and Construction Processes , 1999 .
[2] John Paul Macduffie,et al. Creating Lean Suppliers: Diffusing Lean Production through the Supply Chain , 1997 .
[3] James R. Evans. Production & Operations Management : Quality, Performance, and Value , 1997 .
[4] K. London,et al. An industrial organization economic supply chain approach for the construction industry: a review , 2001 .
[5] David Arditi,et al. Issues in Subcontracting Practice , 2005 .
[6] Charles N. Calvano,et al. Systems engineering in an age of complexity , 2004 .
[7] Iris D. Tommelein,et al. Just-in-Time Concrete Delivery: Mapping Alternatives for Vertical Supply Chain Integration , 1999 .
[8] John R. Shook,et al. Learning to See: Value Stream Mapping to Create Value and , 1998 .
[9] Herman Glenn Ballard,et al. THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL , 2000 .
[10] G. D. Galsworth,et al. Visual systems : harnessing the power of the visual workplace , 1997 .
[11] Iris D. Tommelein,et al. Work Structuring to Achieve Integrated Product-Process Design , 2004 .
[12] Burcu Akinci,et al. 3D Modeling and Real-Time Monitoring in Support of Lean Production of Engineered-to-Order Precast Concrete Buildings , 2003 .
[13] Jeffrey K. Liker,et al. The Toyota way : 14 management principles from the world's greatest manufacturer , 2004 .
[14] Karl R. Popper. The Logic of Scientific Discovery. , 1977 .
[15] Gregory A. Howell,et al. Toward construction JIT , 1997 .
[16] Glenn Ballard,et al. Construction: One Type of Project Production System , 2005 .
[17] Iris D. Tommelein,et al. Pull-Driven Scheduling for Pipe-Spool Installation: Simulation of Lean Construction Technique , 1998 .
[18] Burcu Akinci,et al. The Need for Prompt Schedule Update by Utilizing Reality Capture Technologies: A Case Study , 2005 .
[19] Thomas E. Morton,et al. Heuristic scheduling systems : with applications to production systems and project management , 1993 .
[20] Frederick S. Hillier,et al. Introduction of Operations Research , 1967 .
[21] Lauri Koskela,et al. Application of the New Production Philosophy to Construction , 1992 .
[22] Chris Hendrickson,et al. Project Management for Construction: Fundamental Concepts for Owners, Engineers, Architects, and Builders , 1989 .
[23] Iris D. Tommelein,et al. Value Stream Mapping for Make-to-Order Products in a Job Shop Environment , 2005 .
[24] D. Campbell,et al. EXPERIMENTAL AND QUASI-EXPERIMENT Al DESIGNS FOR RESEARCH , 2012 .
[25] H. Randolph Thomas,et al. Role of the Fabricator in Labor Productivity , 2000 .
[26] H. W. Parker,et al. Productivity improvement in construction , 1988 .
[27] Karl T. Ulrich,et al. Product Design and Development , 1995 .
[28] Gregory A. Howell,et al. Interaction between subcycles: one key to improved methods , 1993 .
[29] Iris D. Tommelein,et al. Strategic Positioning of Inventory to Match Demand in a Capital Projects Supply Chain , 2004 .
[30] Sven Bertelsen,et al. Construction as a Complex System , 2003 .
[31] Richard L. Tucker,et al. Is construction project planning really doing its job? A critical examination of focus, role and process , 1987 .
[32] Feniosky Peña-Mora,et al. Reliability Buffering for Construction Projects , 2004 .
[33] Shigeo Shingo,et al. Non-Stock Production: The Shingo System for Continuous Improvement , 1988 .
[34] John W. Creswell,et al. Research Design: Qualitative, Quantitative, and Mixed Methods Approaches , 2010 .
[35] William K. Holstein,et al. Work Flow Structure: An Analysis for Planning and Control , 1970 .
[36] H. Randolph Thomas,et al. Role of Inventory Buffers in Construction Labor Performance , 2005 .
[37] Colin Robson,et al. Real World Research: A Resource for Social Scientists and Practitioner-Researchers , 1993 .
[38] Glenn Ballard,et al. Learning to see work flow: an application of lean concepts to precast concrete fabrication , 2003 .
[39] Jack R. Meredith,et al. The managemant of operations: a conceptual emphasis , 1992 .
[40] Masanobu Sakamoto,et al. A STUDY OF THE RELATIONSHIP BETWEENBUFFERS AND PERFORMANCE IN CONSTRUCTION , 2002 .
[41] Iris D. Tommelein,et al. Interactive Dynamic Layout Planning , 1993 .
[42] Iris D. Tommelein,et al. Contributors to lead time in construction supply chains: case of pipe supports used in power plants , 2002, Proceedings of the Winter Simulation Conference.
[43] Iris D. Tommelein,et al. Capital Projects Supply Chain Management: SC Tactics of a Supplier Organization , 2003 .
[44] Lucio Soibelman,et al. Material Waste in Building Industry: Main Causes and Prevention , 2002 .
[45] Julio C. Martinez,et al. Stroboscope: State and resource based simulation of construction processes. , 1996 .
[46] Kerry London,et al. Construction supply chain modeling : a research review and interdisciplinary research agenda , 2004 .
[47] Iris D. Tommelein,et al. Materials and Information Flows for HVAC Ductwork Fabrication and Site Installation , 2000 .
[48] Nashwan Dawood. Scheduling in the precast concrete industry using the simulation modelling approach , 1995 .
[49] Iris D. Tommelein,et al. PARADE GAME :I MPACT OF WORK FLOW VARIABILITY ON TRADE PERFORMANCE , 1999 .
[50] R. Kenley,et al. Process Dynamics: Identifying a Strategy for the Deployment of Buffers in Building Projects , 1998 .
[51] Katsundo Hitomi. Manufacturing Systems Engineering: A Unified Approach to Manufacturing Technology, Production Management and Industrial Economics , 1996 .
[52] George Norman,et al. The role of logistics in the materials flow control process , 1998 .
[53] Michel Greif,et al. The Visual Factory: Building Participation Through Shared Information , 1991 .
[54] Glenn Ballard,et al. What Kind of Production Is Construction , 1998 .
[55] Jack R. Meredith,et al. Building operations management theory through case and field research , 1998 .
[56] Ad Santos,et al. Application of flow principles in the production management of construction sites , 1999 .
[57] Ubiraci Espinelli Lemes de Souza,et al. Symbiotic Crew Relationships and Labor Flow , 2004 .
[58] Michael J. Horman. Modeling the Effects of Lean Capacity Strategies on Project Performance , 2001 .
[59] Don T. Phillips,et al. A state-of-the-art survey of dispatching rules for manufacturing job shop operations , 1982 .
[60] Steven Nahmias,et al. Production and operations analysis , 1992 .
[61] Mohamed Mohamed Naim,et al. Construction Supply Chain Trend Analysis , 1999 .
[62] Lawrence P. Leach,et al. Critical Chain Project Management , 2000 .
[63] Danny Samson,et al. Effective case research in operations management: a process perspective , 2002 .
[64] W. J. Stevenson,et al. PRODUCTION OPERATIONS MANAGEMENT , 1992 .
[65] R. Schonberger. Japanese manufacturing techniques : nine hidden lessons simplicity , 1982 .
[66] Chien-Ho Ko,et al. Fabrication Lead Time and Demand Variability: An Empirical Study , 2005 .
[67] John L. Burbidge,et al. Change to group technology: process organization is obsolete , 1992 .
[68] T. Michael Toole,et al. BUILDING PERFORMANCE ENGINEERING DURING CONSTRUCTION , 2005 .
[69] Iris D. Tommelein,et al. Buffering and Batching Practices in the HVAC Industry , 2003 .
[70] Christine Pasquire,et al. Leaner Construction Through Off-Site Manufacturing , 2002 .
[71] R. Yin. Case Study Research: Design and Methods , 1984 .
[72] Nuno António,et al. Product-Process Development Simulation to Support Specialty Contractor Involvement in Early Design , 2001 .
[73] Martin Fischer,et al. Importance of Capacity Constraints to Construction Cost and Schedule , 2000 .
[74] Lauri Koskela,et al. The four roles of supply chain management in construction , 2000 .
[75] Lauri Koskela,et al. An exploration towards a production theory and its application to construction , 2000 .
[76] Jeff Cox,et al. The Goal: A Process of Ongoing Improvement , 1984 .
[77] Glenn Ballard,et al. Lean production theory: Moving beyond "Can-Do" * , 1997 .
[78] John Messner,et al. Using Buffers to Manage Production: A Case Study of the Pentagon Renovation Project , 2003 .