Analyze on Development Prospects of 300m Level Ultra-high CFRD from Shuibuya High CFRD

Successful experiences of Shuibuya CFRD are comprehensively expounded. The feasibility and the necessity constructing 300 m level ultra-high CFRD are analyzed. According to successful experiences gained, existing key technical problems are analyzed in 300 m level ultra-high CFRD construction and the future development prospects are explored.