Practical approaches for validating a construction simulation

This paper presents three methods implemented in the activity-based construction modeling and simulation (ABC) system for validating a construction simulation. The first method reports a simulation experiment in chronological order so that the user can examine the operating sequence of the model. The second method provides the summary information of total operating counts and mean durations of all activities in the model so that the user can evaluate whether all activities have been correctly executed during simulation. The third method produces the cyclic report of a selected resource entity so that the user can examine whether the entity is moving in the correct logical and chronological order during simulation. The three methods can effectively assist the user in debugging a simulation model so as to assure that the simulation is correctly conducted. A road paving process is employed to illustrate these methods.

[1]  D.W. Halpin,et al.  Real world applications of construction process simulation , 1999, WSC'99. 1999 Winter Simulation Conference Proceedings. 'Simulation - A Bridge to the Future' (Cat. No.99CH37038).

[2]  A. Alan B. Pritsker Introduction to simulation and SLAM II (2nd ed.) , 1984 .

[3]  R. D. Smet Simulation modeling and analysis (2nd edition): Averill M. Law and W. David Kelton McGraw-Hill, Inc., New York, 1991, xxii + 759 pages, £31.05, ISBN 0 07 036698 5 , 1993 .

[4]  Boyd C. Paulson Interactive Graphics for Simulating Construction Operations , 1978 .

[5]  Photios G. Ioannou,et al.  Graphical object-oriented discrete-event simulation system , 1992, WSC '92.

[6]  Simaan M. AbouRizk,et al.  Simphony: an environment for building special purpose construction simulation tools , 1999, WSC '99.

[7]  Daniel W. Halpin,et al.  Simulation of cable-stayed bridges using DISCO , 1994, Proceedings of Winter Simulation Conference.

[8]  Hong Zhang,et al.  Iconic Animation for Activity-based Construction Simulation , 2002 .

[9]  Daniel W. Halpin,et al.  CYCLONE — Method for Modeling Job Site Processes , 1977 .

[10]  Iris D. Tommelein,et al.  Knowledge-based assembly of simulation networks using construction designs, plans, and methods , 1994, Proceedings of Winter Simulation Conference.

[11]  Bernard P. Zeigler,et al.  Multifacetted Modelling and Discrete Event Simulation , 1984 .

[12]  Michael Pidd,et al.  Computer Simulation in Management Science (3rd Edition) , 1998 .

[13]  Simaan M. AbouRizk,et al.  Measuring Productivity and Validating Microcomputer Simulation , 1991 .

[14]  Jonathan Jingsheng Shi,et al.  ACTIVITY-BASED CONSTRUCTION (ABC) MODELING AND SIMULATION METHOD , 1999 .

[15]  M. Pidd COMPUTER SIMULATION FOR OPERATIONAL RESEARCH IN 1984 , 1984 .

[16]  Photios G. Ioannou,et al.  General-purpose systems for effective construction simulation , 1999 .

[17]  Averill M. Law,et al.  Simulation Modeling and Analysis , 1982 .

[18]  Ray J. Paul Recent Developments in Simulation Modelling , 1991 .

[19]  LeRoy T. Boyer,et al.  Modeling Method-Productivity , 1976 .

[20]  A. Alan B. Pritsker,et al.  Introduction to simulation and SLAM II , 1979 .

[21]  Daniel W. Halpin,et al.  Planning and analysis of construction operations , 1992 .