DELIVERY PROCESS ATTRIBUTES, COMMON TO INDIA AND THE U.S., FOR MORE SUSTAINABLE BUILDINGS

Abstract India is a rapidly developing nation, so its adoption of sustainable building would have considerable social, environmental, and economic benefits. However, process attributes that contribute to successful delivery (planning, design, construction and operation) of sustainable buildings in India are largely undefined. Other projects in India would benefit from a rigorous identification of these process attributes, which is the purpose of this research. This research applies process mapping to study the delivery of Soundarya Decorator's factory building in Chennai, India; a project which achieved advanced sustainability performance with no first cost increase. From these process maps, process attributes are identified and compared to those identified in a previously published study of Toyota's South Campus facility in Torrance, California. Process attributes common to both projects include: demonstrating an early commitment to sustainability by key stakeholders; setting goals related to sustainabil...

[1]  Matt Syal,et al.  Adoption of Green Building Guidelines in Developing Countries Based on U.S. and India Experiences , 2009 .

[2]  John R. Shook,et al.  Learning to See: Value Stream Mapping to Create Value and , 1998 .

[3]  Mark Konchar,et al.  Comparison of U.S. Project Delivery Systems , 1998 .

[4]  David R. Riley,et al.  Piloting Evaluation Metrics for Sustainable High-Performance Building Project Delivery , 2010 .

[5]  Martin Sexton,et al.  Process models implementation in the construction industry: a literature synthesis , 2005 .

[6]  Leidy E. Klotz,et al.  Process transparency for sustainable building delivery , 2009 .

[7]  Amm Liu,et al.  Research Methods for Construction (3rd ed.) , 2008 .

[8]  Elliot B. Gordon,et al.  Integrated design and building process: what research and methodologies are needed? , 2000 .

[9]  Jerry Yudelson,et al.  Green Building Through Integrated Design , 2008 .

[10]  Bill Curtis,et al.  Process modeling , 1992, CACM.

[11]  Robert Ries,et al.  Investigation of the Relationship between Green Design and Project Delivery Methods , 2008 .

[12]  Jorge A Vanegas,et al.  Road map and principles for built environment sustainability. , 2003, Environmental science & technology.

[13]  Michael James,et al.  Greening our built world : costs, benefits, and strategies , 2010 .

[14]  Andrew N. Baldwin,et al.  Analytical design planning technique: a model of the detailed building design process , 1999 .

[15]  Cathy Turner,et al.  Green Building Performance Evaluation: Measured Results from LEED-New Construction Buildings , 2008 .

[16]  Leidy Klotz,et al.  A Lean Modeling Protocol for Evaluating Green Project Delivery , 2007 .

[17]  Paul Bowen,et al.  Sustainable construction: principles and a framework for attainment , 1997 .

[18]  Clarence G. Feldmann,et al.  The practical guide to business process reengineering using IDEF0 , 1998 .

[19]  John W. Mogge Breaking Through the First Cost Barriers to Sustainable Planning, Design and Construction , 2004 .

[20]  Ronald P. Anjard Process mapping: one of three, new, special quality tools for management, quality and all other professionals , 1996 .

[21]  David R. Riley,et al.  Lean Processes for Sustainable Project Delivery , 2006 .