Effects of alternative road pricing systems on network performance
暂无分享,去创建一个
[1] J. Dawson,et al. ELECTRONIC ROAD PRICING IN HONG KONG. 1. A FAIR WAY TO GO , 1985 .
[2] I Catling,et al. THE LONDON CONGESTION CHARGING RESEARCH PROGRAMME - 2. ADMINISTRATION AND TECHNOLOGY , 1996 .
[3] P. Goodwin. A REVIEW OF NEW DEMAND ELASTICITIES WITH SPECIAL REFERENCE TO SHORT AND LONG RUN EFFECTS OF PRICE CHANGES , 1992 .
[4] Anthony D. May,et al. Modelling the network effects of road user charging , 1993 .
[5] C. Gilliam,et al. The London Congestion Charging Research Programme - 1: the programme in overview , 1996 .
[6] Adolf D May,et al. THE DESIGN OF INTEGRATED TRANSPORT STRATEGIES. , 1995 .
[7] P W Bonsall,et al. DO TIME-BASED ROAD-USER CHARGES INDUCE RISK-TAKING? - RESULTS FROM A DRIVING SIMULATOR , 1997 .
[8] David Watling,et al. Demand responsive assignment in SATURN , 1992 .
[9] Anthony D. May,et al. A COMPARISON OF THE NETWORK EFFECTS OF FOUR ROAD-USER CHARGING SYSTEMS , 1994 .
[10] Anthony D. May. SUPPLEMENTARY LICENSING: AN EVALUATION , 1975 .
[11] O I Larsen,et al. The toll ring in Bergen, Norway ― The first year of operation , 1988 .
[12] R. A. Johnson. ADMINISTRATION AND TECHNOLOGY1 , 1963 .
[13] A D May,et al. THE LONDON CONGESTION CHARGING RESEARCH PROGRAMME. 5. ASSESSMENT OF THE IMPACTS , 1996 .
[14] D Van Vliet. SATURN - A MODERN ASSIGNMENT MODEL , 1982 .
[15] N B Taylor. CONTRAM 5: AN ENHANCED TRAFFIC ASSIGNMENT MODEL , 1990 .