Decision-making model for track system of high-speed rail lines : Ballasted track, ballastless track or both?
暂无分享,去创建一个
[1] Georgios Michas,et al. Slab track systems for high-speed railways. , 2012 .
[2] L. Brajović,et al. Managing rail service life , 2014 .
[3] Andrés López-Pita,et al. Improvements in High-Speed Ballasted Track Design: Benefits of Bituminous Subballast Layers , 2006 .
[4] Peter Maurer,et al. Life Cycle Costing For Construction , 2016 .
[5] Gunnar Beskow,et al. Soil freezing and frost heaving with special application to roads and railroads : with a special supplement for the English translation of progress form 1935 to 1946 , 1948 .
[6] Sunil K Kondapalli,et al. Life Cycle Benefit of Concrete Slab Track , 2008 .
[7] Gregory Paul Makusa,et al. Soil stabilization methods and materials in engineering practice : State of the art review , 2013 .
[8] Jie Han,et al. Impact of Water Level Rise on the Behaviors of Railway Track Structure and Substructure , 2015 .
[9] D. Sheng,et al. Analysis of frost heave mechanisms in a high-speed railway embankment , 2016 .
[10] 장승엽,et al. Modern Railway Track, 2nd Edition , 2012 .
[11] S J Kirk,et al. LIFE CYCLE COSTING FOR DESIGN PROFESSIONALS. 2ND REVISED EDITION , 1995 .
[12] David Connolly,et al. Railway critical velocity – Analytical prediction and analysis , 2016 .
[13] Konstantinos Tzanakakis,et al. The Railway Track and Its Long Term Behaviour: A Handbook for a Railway Track of High Quality , 2013 .
[14] P. F. Teixeira,et al. New possibilities to reduce track costs on high-speed lines using a bituminous sub-ballast layer , 2010 .
[15] Robert LIN,et al. NOTE ON FUZZY SETS , 2014 .
[16] 이규순. Dynamic Compaction , 2019, The Material Point Method for Geotechnical Engineering.
[17] Cheng Guodong,et al. The mechanism of repeated-segregation for the formation of thick layered ground ice , 1983 .
[18] G. Jing,et al. Ballast Flying Mechanism and Sensitivity Factors Analysis , 2012 .
[19] C Esveld,et al. AVOIDANCE OF EXPANSION JOINTS IN HIGH-SPEED CWR TRACK ON LONG BRIDGES , 1995 .
[20] A. Zoeteman. Life cycle cost analysis for managing rail infrastructure , 2001 .
[21] Konstantinos Giannakos,et al. Transition Zone between Ballastless and Ballasted Track: Influence of Changing Stiffness on Acting Forces , 2012 .
[22] J. Zakeri,et al. Investigation on dynamic behavior of railway track in transition zone , 2011 .
[23] Xuesong Jin,et al. Investigation into external noise of a high-speed train at different speeds , 2014 .
[24] M. Esmaeili,et al. Investigating the Influence of Auxiliary Rails on Dynamic Behavior of Railway Transition Zone by a 3D Train-Track Interaction Model , 2017 .
[25] Cédric Sauzéat,et al. Use of a bituminous mixture layer in high-speed line trackbeds , 2016 .
[26] Julian M. Allwood,et al. Assessing the CO2 impact of current and future rail track in the UK , 2010 .
[27] Aileen C Yenco. Decision Tree for Ground Improvement in Transportation Applications , 2013 .
[28] Victor V. Krylov,et al. Generation of Ground Vibrations by Superfast Trains , 1995 .
[29] Willem Ebersohn. Implementing a Railway Infrastructure Maintenance System , 1998 .
[30] Peter Veit,et al. Making a Case For Under-Sleeper Pads , 2011 .
[31] Lotfi A. Zadeh,et al. Outline of a New Approach to the Analysis of Complex Systems and Decision Processes , 1973, IEEE Trans. Syst. Man Cybern..
[33] Daichao Sheng,et al. A potential new frost heave mechanism in high-speed railway embankments , 2014 .
[34] Haoyu Wang,et al. Structural Health Monitoring of Railway Transition Zones Using Satellite Radar Data , 2018, Sensors.
[35] Nick Thom,et al. Bitumen stabilized ballast: a potential solution for railway track-bed , 2016 .