Decision-making model for track system of high-speed rail lines : Ballasted track, ballastless track or both?

During the 50 years of existence of high speed railways, the track structure solutions have developedboth in number and in type. As of today, in case of conventional railway, there are 2 main types ...

[1]  Georgios Michas,et al.  Slab track systems for high-speed railways. , 2012 .

[2]  L. Brajović,et al.  Managing rail service life , 2014 .

[3]  Andrés López-Pita,et al.  Improvements in High-Speed Ballasted Track Design: Benefits of Bituminous Subballast Layers , 2006 .

[4]  Peter Maurer,et al.  Life Cycle Costing For Construction , 2016 .

[5]  Gunnar Beskow,et al.  Soil freezing and frost heaving with special application to roads and railroads : with a special supplement for the English translation of progress form 1935 to 1946 , 1948 .

[6]  Sunil K Kondapalli,et al.  Life Cycle Benefit of Concrete Slab Track , 2008 .

[7]  Gregory Paul Makusa,et al.  Soil stabilization methods and materials in engineering practice : State of the art review , 2013 .

[8]  Jie Han,et al.  Impact of Water Level Rise on the Behaviors of Railway Track Structure and Substructure , 2015 .

[9]  D. Sheng,et al.  Analysis of frost heave mechanisms in a high-speed railway embankment , 2016 .

[10]  장승엽,et al.  Modern Railway Track, 2nd Edition , 2012 .

[11]  S J Kirk,et al.  LIFE CYCLE COSTING FOR DESIGN PROFESSIONALS. 2ND REVISED EDITION , 1995 .

[12]  David Connolly,et al.  Railway critical velocity – Analytical prediction and analysis , 2016 .

[13]  Konstantinos Tzanakakis,et al.  The Railway Track and Its Long Term Behaviour: A Handbook for a Railway Track of High Quality , 2013 .

[14]  P. F. Teixeira,et al.  New possibilities to reduce track costs on high-speed lines using a bituminous sub-ballast layer , 2010 .

[15]  Robert LIN,et al.  NOTE ON FUZZY SETS , 2014 .

[16]  이규순 Dynamic Compaction , 2019, The Material Point Method for Geotechnical Engineering.

[17]  Cheng Guodong,et al.  The mechanism of repeated-segregation for the formation of thick layered ground ice , 1983 .

[18]  G. Jing,et al.  Ballast Flying Mechanism and Sensitivity Factors Analysis , 2012 .

[19]  C Esveld,et al.  AVOIDANCE OF EXPANSION JOINTS IN HIGH-SPEED CWR TRACK ON LONG BRIDGES , 1995 .

[20]  A. Zoeteman Life cycle cost analysis for managing rail infrastructure , 2001 .

[21]  Konstantinos Giannakos,et al.  Transition Zone between Ballastless and Ballasted Track: Influence of Changing Stiffness on Acting Forces , 2012 .

[22]  J. Zakeri,et al.  Investigation on dynamic behavior of railway track in transition zone , 2011 .

[23]  Xuesong Jin,et al.  Investigation into external noise of a high-speed train at different speeds , 2014 .

[24]  M. Esmaeili,et al.  Investigating the Influence of Auxiliary Rails on Dynamic Behavior of Railway Transition Zone by a 3D Train-Track Interaction Model , 2017 .

[25]  Cédric Sauzéat,et al.  Use of a bituminous mixture layer in high-speed line trackbeds , 2016 .

[26]  Julian M. Allwood,et al.  Assessing the CO2 impact of current and future rail track in the UK , 2010 .

[27]  Aileen C Yenco Decision Tree for Ground Improvement in Transportation Applications , 2013 .

[28]  Victor V. Krylov,et al.  Generation of Ground Vibrations by Superfast Trains , 1995 .

[29]  Willem Ebersohn Implementing a Railway Infrastructure Maintenance System , 1998 .

[30]  Peter Veit,et al.  Making a Case For Under-Sleeper Pads , 2011 .

[31]  Lotfi A. Zadeh,et al.  Outline of a New Approach to the Analysis of Complex Systems and Decision Processes , 1973, IEEE Trans. Syst. Man Cybern..

[33]  Daichao Sheng,et al.  A potential new frost heave mechanism in high-speed railway embankments , 2014 .

[34]  Haoyu Wang,et al.  Structural Health Monitoring of Railway Transition Zones Using Satellite Radar Data , 2018, Sensors.

[35]  Nick Thom,et al.  Bitumen stabilized ballast: a potential solution for railway track-bed , 2016 .