Back analysis of rock mass parameters and initial stress for the Longtan tunnel in China
暂无分享,去创建一个
Wei Gao | Mingming Ge | Wei Gao | M. Ge
[1] K. Takeuchi,et al. Back analysis of measured displacements of tunnels , 1983 .
[2] P. K. Kaiser,et al. Stress determination by back-analysis of excavation-induced stress changes — a case study , 1990 .
[3] Charles Leave. Neural Networks: Algorithms, Applications and Programming Techniques , 1992 .
[4] M. Hisatake. Back analysis in tunneling , 1995 .
[5] L. Yang,et al. Back analysis of initial rock stresses and time-dependent parameters , 1996 .
[6] Nii Attoh-Okine. Artificial intelligence and mathematical methods in pavement and geomechanical systems , 1998 .
[7] Simon Haykin,et al. Neural Networks: A Comprehensive Foundation , 1998 .
[8] Xia-Ting Feng,et al. Estimating mechanical rock mass parameters relating to the Three Gorges Project permanent shiplock using an intelligent displacement back analysis method , 2000 .
[9] Yanjun Shang,et al. Intelligent back analysis of displacements using precedent type analysis for tunneling , 2002 .
[10] Xu Han,et al. Neural identification of rock parameters using fuzzy adaptive learning parameters , 2003 .
[11] Pierpaolo Oreste,et al. Back-Analysis Techniques for the Improvement of the Understanding of Rock in Underground Constructions , 2005 .
[12] Luqing Zhang,et al. A displacement-based back-analysis method for rock mass modulus and horizontal in situ stress in tunneling – Illustrated with a case study , 2006 .
[13] Hiroshi Morioka,et al. Back-analysis of rock mass strength parameters using AE monitoring data , 2007 .
[14] G. Wei. STUDY ON SURROUNDING ROCK STABILITY OF LONGTAN TUNNEL BASED ON IN-SITU MONITORING MEASUREMENTS , 2007 .
[15] Yuzhen Yu,et al. An intelligent displacement back-analysis method for earth-rockfill dams , 2007 .
[16] M. Hisatake,et al. Three-dimensional back-analysis method for the mechanical parameters of the new ground ahead of a tunnel face , 2008 .
[17] Mostafa Sharifzadeh,et al. Displacement-based numerical back analysis for estimation of rock mass parameters in Siah Bisheh powerhouse cavern using continuum and discontinuum approach , 2012 .
[18] Mohammad Ali Moridi,et al. Time-dependent behavior of tunnel lining in weak rock mass based on displacement back analysis method , 2013 .
[19] John C. Brigham,et al. Inverse calculation of in situ stress in rock mass using the Surrogate-Model Accelerated Random Search algorithm , 2014 .
[20] R. Azevedo. Applications of Computational Mechanics in Geotechnical Engineering , 2020 .