Cost-effective deconstruction by a combination of dismantling, sorting and recycling processes
暂无分享,去创建一个
[1] Frank Schultmann,et al. Deconstruction selective - etude scientifique de la deconstruction selective d'une immeuble a Mulhouse , 1998 .
[2] Otto Rentz,et al. The state of deconstruction in Germany , 2000 .
[3] Philip M. Wolfe,et al. Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach , 1969 .
[4] Soofia Tahira Elias-Ozkan. Recycling rubble into aggregates: a model for local governments , 2001 .
[5] Amory B. Lovins,et al. Natural Capitalism: Creating the Next Industrial Revolution , 1999 .
[6] Frank Schultmann. Kreislaufführung von Baustoffen. Stoffflußbasiertes Projektmanagement für die operative Demontage- und Recyclingplanung von Gebäuden , 1998 .
[7] R.W.J. Aldington,et al. Green technology and design for the environment , 1998 .
[8] Howard T. Odum,et al. Systems ecology : an introduction , 1984 .
[9] W Addis,et al. Design for Deconstruction , 2004 .
[10] Alf Kimms,et al. Beyond Manufacturing Resource Planning (MRP II) , 1998 .
[11] James J. Kay. On complexity theory, exergy, and industrial ecology : Some implications for construction ecology , 2003 .
[12] S. Boehmer-Christiansen. Factor Four: Doubling Wealth, Halving Resource Use , 1997 .
[13] V J Rayward-Smith. Project Scheduling: Recent Models, Algorithms and Applications , 2001, J. Oper. Res. Soc..
[14] Jesse H. Ausubel,et al. National Materials Flows and the Environment , 1995 .
[15] Otto Rentz,et al. Strategies for the quality improvement of recycling materials , 1997 .
[16] Philip Crowther. Building Deconstruction in Australia , 2000 .
[17] S. Bringezu. Construction ecology and metabolism : rematerialization and dematerialization , 2002 .
[18] Kevin Otto,et al. Product Design: Techniques in Reverse Engineering and New Product Development , 2000 .
[19] Robert Klein,et al. Scheduling of Resource-Constrained Projects , 1999 .
[20] Philip Crowther. Developing and Inclusive Model for Design for Deconstruction , 2001 .
[21] G. Schmidt. Scheduling under resource constraints — Deterministic models , 1987 .
[22] ROB P. GERAEDTS. UPGRADING THE FLEXIBILITY OF BUILDINGS , 2001 .
[23] Rolf H. Möhring,et al. Resource-constrained project scheduling: Notation, classification, models, and methods , 1999, Eur. J. Oper. Res..
[24] P. Sheng,et al. Design for environment , 2000 .
[25] J. Robertson. Factor four: Doubling wealth, halving resource use , 1997 .
[26] Stewart Brand,et al. How Buildings Learn: What Happens After They're Built , 1997 .
[27] Stephen Kendall,et al. Residential Open Building , 2000 .
[28] Valerie Sindt,et al. Demontage und Recycling von Gebäuden - Entwicklung von Demontage- und Verwertungskonzepten unter besonderer Berücksichtigung der Umweltverträglichkeit , 1997 .
[29] Frank Schultmann. Resource-constraint project scheduling for deconstruction projects , 2003 .
[30] W. H. M. Zijm,et al. Towards intelligent manufacturing planning and control systems , 2000, OR Spectr..
[31] Surendra M. Gupta,et al. Disassembly sequence planning for products with defective parts in product recovery , 1998 .
[32] D. Orr. Earth in Mind: On Education, Environment, and the Human Prospect , 1994 .
[33] Kosuke Ishii,et al. PRODUCT END-OF-LIFE STRATEGY CATEGORIZATION DESIGN TOOL , 1999 .