Simultaneous monitoring of magnitude and time-between-events data with a Max-EWMA control chart
暂无分享,去创建一个
[1] Jun Yang,et al. Distribution-free EWMA schemes for simultaneous monitoring of time between events and event magnitude , 2018, Comput. Ind. Eng..
[2] Douglas C. Montgomery,et al. Statistical quality control : a modern introduction , 2009 .
[3] Sajid Ali. Time-between-events control charts for an exponentiated class of distributions of the renewal process , 2017, Qual. Reliab. Eng. Int..
[4] Hansheng Xie,et al. Contributions to qualimetry , 1999 .
[5] Pei-Wen Chen,et al. An ARL-unbiased design of time-between-events control charts with runs rules , 2011 .
[6] Amitava Mukherjee,et al. A combination of max‐type and distance based schemes for simultaneous monitoring of time between events and event magnitudes , 2018, Qual. Reliab. Eng. Int..
[7] Christos Koukouvinos,et al. Monitoring of time between events with a double generally weighted moving average control chart , 2018, Qual. Reliab. Eng. Int..
[8] D. Hawkins,et al. Cumulative Sum Charts and Charting for Quality Improvement , 1998, Statistics for Engineering and Physical Science.
[9] Min Xie,et al. Statistical Models and Control Charts for High-Quality Processes , 2002 .
[10] Thong Ngee Goh,et al. A control chart for the Gamma distribution as a model of time between events , 2007 .
[11] Rainer Göb,et al. An Overview of Control Charts for High‐quality Processes , 2016, Qual. Reliab. Eng. Int..
[12] Muhammad Riaz,et al. EWMA-type scheme for monitoring location parameter using auxiliary information , 2017, Comput. Ind. Eng..
[13] Zhang Wu,et al. A control scheme for monitoring the frequency and magnitude of an event , 2009 .
[14] R Core Team,et al. R: A language and environment for statistical computing. , 2014 .
[15] Zhen He,et al. A Cumulative Sum scheme for monitoring frequency and size of an event , 2009, Qual. Reliab. Eng. Int..
[16] Thong Ngee Goh,et al. Design and application of exponential chart for monitoring time-between-events data under random process shift , 2011 .
[17] Smiley W. Cheng,et al. Monitoring Process Mean and Variability with One EWMA Chart , 2001 .
[18] Zachary G. Stoumbos,et al. Should Exponentially Weighted Moving Average and Cumulative Sum Charts Be Used With Shewhart Limits? , 2005, Technometrics.
[19] Xiao Han,et al. Reliability-oriented design of integrated model of preventive maintenance and quality control policy with time-between-events control chart , 2019, Comput. Ind. Eng..
[20] Philippe Castagliola,et al. A CUSUM scheme for event monitoring , 2013 .
[21] Fu-Kwun Wang,et al. A comparison study of control charts for Weibull distributed time between events , 2017, Qual. Reliab. Eng. Int..
[22] Min Xie,et al. A study of time-between-events control chart for the monitoring of regularly maintained systems , 2009, Qual. Reliab. Eng. Int..
[23] Thong Ngee Goh,et al. Economic design of time-between-events control chart system , 2011, Comput. Ind. Eng..
[24] Michael B. C. Khoo,et al. A new control chart for monitoring the event frequency and magnitude , 2014 .
[25] James M. Lucas,et al. Exponentially weighted moving average control schemes: Properties and enhancements , 1990 .
[26] Zhen He,et al. Statistical computation and analyses for attribute events , 2009, Comput. Stat. Data Anal..
[27] Yongzhong Wu,et al. A TBE control chart-based maintenance policy for a service facility , 2018, Comput. Ind. Eng..
[28] Jaime A. Camelio,et al. The Effect of Aggregating Data When Monitoring a Poisson Process , 2013 .
[29] Jianxin Jiao,et al. A single control chart for monitoring the frequency and magnitude of an event , 2009 .
[30] Muhammad Riaz,et al. An EWMA monitoring scheme with a single auxiliary variable for industrial processes , 2017, Comput. Ind. Eng..
[31] M. Shamsuzzaman,et al. A combined control scheme for monitoring the frequency and size of an attribute event , 2010 .
[32] Muhammad Riaz,et al. Combined Shewhart CUSUM charts using auxiliary variable , 2017, Comput. Ind. Eng..
[33] Sajid Ali,et al. Time and magnitude monitoring based on the renewal reward process , 2018, Reliab. Eng. Syst. Saf..
[34] Thong Ngee Goh,et al. Some effective control chart procedures for reliability monitoring , 2002, Reliab. Eng. Syst. Saf..
[35] Jaime A. Camelio,et al. Cumulative Sum Control Charts for Monitoring Weibull-distributed Time Between Events , 2015, Qual. Reliab. Eng. Int..