A Model for Continuous-Review Pull Policies in Serial Inventory Systems

In this paper, we construct a model of the steady-state values of on-hand inventory and backorders for each facility of a serial inventory system in which each facility follows a Q, R policy based on installation stock. Such policies are represented by the popular kanban systems as well as more conventional applications of Q, R policies. The descriptive model presented here is intended for optimizing the parameters of such a policy and for obtaining theoretical results about the behavior of the system. We also illustrate the potential of the model for providing insights into system performance.

[1]  Kenneth F. Simpson In-Process Inventories , 1958 .

[2]  F. Hanssmann Optimal Inventory Location and Control in Production and Distribution Networks , 1959 .

[3]  Arthur F. Veinott,et al.  Analysis of Inventory Systems , 1963 .

[4]  B. D. Sivazlian A Continous-Review (s, S) Inventory System with Arbitrary Interarrival Distribution between Unit Demand , 1974, Oper. Res..

[5]  Izzet Sahin On the Stationary Analysis of Continuous Review (s, S) Inventory Systems with Constant Lead Times , 1979, Oper. Res..

[6]  Jeffrey Miller Hedging the master schedule , 1979 .

[7]  Andrew Z. Szendrovits,et al.  Note-Comments on the Optimality in Optimal and System Myopic Policies for Multi-Echelon Production/Inventory Assembly Systems , 1981 .

[8]  J. Williams Note-On the Optimality of Integer Lot Size Ratios in Economic Lot Size Determination in Multi-Stage Assembly Systems , 1982 .

[9]  D. Collier Aggregate Safety Stock Levels and Component Part Commonality , 1982 .

[10]  Gerhard O. Mensch,et al.  TIMS Studies in the management sciences : Burton V. Dean and Joel L. Goldhar (eds.), Management of Research and Innovation, North-Holland Publishing Company, Amsterdam, Vol. 15, 1980, 300 pp. , 1983 .

[11]  William L. Maxwell,et al.  A Modeling Framework for Planning and Control of Production in Discrete Parts Manufacturing and Assembly Systems , 1983 .

[12]  Gabriel R. Bitran,et al.  Deterministic Approximations to Stochastic Production Problems , 1984, Oper. Res..

[13]  B. W. Taylor,et al.  A simulation-based experimental investigation of supply/timing uncertainty in MRP systems , 1984 .

[14]  Thomas G. Schmitt Resolving uncertainty in manufacturing systems , 1984 .

[15]  Christopher H. Nevison,et al.  Dynamic Lot-Sizing When Demand Timing Is Uncertain , 1984, Oper. Res..

[16]  J. Muckstadt,et al.  Protective stocks in multi-stage production systems , 1984 .

[17]  Awi Federgruen,et al.  Computational Issues in an Infinite-Horizon, Multiechelon Inventory Model , 1984, Oper. Res..

[18]  Jc Johan Wortmann,et al.  MRP and inventories , 1985 .

[19]  Christopher H. Nevison A Cost Adjustment Heuristic for Dynamic Lot-Sizing with Uncertain Demand Timing , 1985, Oper. Res..

[20]  Stephen C. Graves,et al.  A Multi-Echelon Inventory Model for a Repairable Item with One-for-One Replenishment , 1985 .

[21]  L. B. Schwarz,et al.  Fill-Rate Optimization in a One-Warehouse N-Identical Retailer Distribution System , 1985 .

[22]  R. C. Carlson,et al.  An analysis of scheduling policies in multiechelon production systems , 1985 .

[23]  Steven Nahmias,et al.  Optimal Policy for a Two-Stage Assembly System under Random Demand , 1985, Oper. Res..

[24]  M. Lambrecht,et al.  Protective inventories and bottlenecks in production systems , 1985 .

[25]  K. R. Baker,et al.  The Effect of Commonality on Safety Stock in a Simple Inventory Model , 1986 .

[26]  Candace Arai Yano,et al.  Safety Stocks in MRP-Systems with Emergency Setups for Components , 1986 .

[27]  Paul H. Zipkin,et al.  Stochastic leadtimes in continuous‐time inventory models , 1986 .

[28]  Paul H. Zipkin,et al.  Models for Design and Control of Stochastic, Multi-Item Batch Production Systems , 1986, Oper. Res..

[29]  K. R. Baker,et al.  The dynamics of hedging the master schedule , 1986 .

[30]  Jatinder N. D. Gupta,et al.  Determining lot sizes and resource requirements: A review , 1987 .

[31]  Kamran Moinzadeh,et al.  A continuous‐review inventory model with constant resupply time and defective items , 1987 .

[32]  Candace Arai Yano Stochastic leadtimes in two-level distribution type networks , 1987 .

[33]  Candace Aria Yano,et al.  Setting Planned Leadtimes in Serial Production Systems with Tardiness Costs , 1987 .

[34]  Willard I. Zangwill,et al.  Eliminating inventory in a series facility production system , 1987 .

[35]  Candace Aral Yano,et al.  Stochastic Leadtimes in Two-Level Assembly Systems , 1987 .

[36]  Candace Arai Yano,et al.  Interaction between frequency of rescheduling and the role of safety stock in material requirements planning systems , 1987 .

[37]  H. M. Wagner,et al.  Algorithms and Heuristics for Variable-Yield Lot-Sizing. , 1987 .

[38]  M. Magazine,et al.  Component Commonality with Service Level Requirements , 1988 .

[39]  Ralph D. Badinelli,et al.  Backorders optimization in a one-warehouse N-identical retailer distribution system , 1988 .