Scheduling jobs and maintenance activities on parallel machines
暂无分享,去创建一个
[1] Chengbin Chu,et al. Worst-case analysis of the WSPT and MWSPT rules for single machine scheduling with one planned setup period , 2008, Eur. J. Oper. Res..
[2] Wayne E. Smith. Various optimizers for single‐stage production , 1956 .
[3] Zhi-Long Chen,et al. Scheduling jobs and maintenance activities on parallel machines , 2000 .
[4] Hans Kellerer,et al. Fast approximation algorithms to minimize a special weighted flow-time criterion on a single machine with a non-availability interval and release dates , 2011, J. Sched..
[5] Chengbin Chu,et al. Single-machine scheduling with an availability constraint to minimize the weighted sum of the completion times , 2008, Comput. Oper. Res..
[6] Imed Kacem. Approximation algorithms for the makespan minimization with positive tails on a single machine with a fixed non-availability interval , 2009, J. Comb. Optim..
[7] Wieslaw Kubiak,et al. Two-machine flow shops with limited machine availability , 2002, Eur. J. Oper. Res..
[8] Imed Kacem,et al. Strongly Fully Polynomial Time Approximation Scheme for the two-parallel capacitated machines scheduling problem , 2011 .
[9] Maher Rebai,et al. Earliness–tardiness minimization on a single machine to schedule preventive maintenance tasks: metaheuristic and exact methods , 2010, Journal of Intelligent Manufacturing.
[10] Ali Ridha Mahjoub,et al. Fully polynomial time approximation scheme for the weighted flow-time minimization on a single machine with a fixed non-availability interval , 2009, Comput. Ind. Eng..
[11] Chung Yee Lee,et al. Scheduling maintenance and semiresumable jobs on a single machine , 1999 .
[12] George Z. Li. Single machine earliness and tardiness scheduling , 1997 .
[13] Chung-Yee Lee,et al. Minimizing the makespan in the two-machine flowshop scheduling problem with an availability constraint , 1997, Oper. Res. Lett..
[14] Chris N. Potts,et al. A Branch and Bound Algorithm for the Total Weighted Tardiness Problem , 1985, Oper. Res..
[15] Mohamed Haouari,et al. Approximation algorithms for single machine scheduling with one unavailability period , 2009, 4OR.
[16] El Houssaine Aghezzaf,et al. An integrated production and preventive maintenance planning model , 2007, Eur. J. Oper. Res..
[17] Chengbin Chu,et al. Identical parallel-machine scheduling under availability constraints to minimize the sum of completion times , 2009, Eur. J. Oper. Res..
[18] Günter Schmidt,et al. Scheduling with limited machine availability , 2000, Eur. J. Oper. Res..
[19] Imed Kacem. Approximation algorithm for the weighted flow-time minimization on a single machine with a fixed non-availability interval , 2008, Comput. Ind. Eng..
[20] Jacek Blazewicz,et al. An improved approximation algorithm for the single machine total completion time scheduling problem with availability constraints , 2005, Eur. J. Oper. Res..
[21] Hans Kellerer,et al. Two simple constant ratio approximation algorithms for minimizing the total weighted completion time on a single machine with a fixed non-availability interval , 2009, Eur. J. Oper. Res..
[22] Shimon Even,et al. Bounds for the Optimal Scheduling of n Jobs on m Processors , 1964 .