On archetypes and building adaptive reuse

Building adaptive reuse is increasingly being applied as a solution to urban renewal where existing facilities have become obsolete but where significant physical life remains embedded in their structure and materials and/or where heritage and cultural values deserve to be protected. Revitalisation of buildings in this context is a valid response to climate change and sustainability agenda as it has the potential to reuse a large proportion of resources in place without destruction or substantial replacement. There are now a large number of examples of successful adaptive reuse projects across a broad range of facility types worldwide. This paper applies an existing adaptive reuse potential (ARP) model to construct archetypes or patterns for various facility categories to provide insight into project feasibility decisions. The probability of success is tested using a unique application of PERT analysis for a range of obsolescence rates. The archetypes reflect distinct characteristics that help inform selection of potential reuse opportunities.

[1]  James Douglas Building Adaptation, Second Edition , 2006 .

[2]  John Abbotts,et al.  Building leasing at the department of energy's Hanford site: Lessons learned from commercial reuse , 2003 .

[3]  Craig Langston,et al.  Strategic Management of Built Facilities , 2002 .

[4]  M. Lane,et al.  Conservation through Conversation: Collaborative Planning for Reuse of a Former Military Property in Sauk County, Wisconsin, USA , 2002 .

[5]  Joe Doak Planning for the Reuse of Redundant Defence Estate: Disposal Processes, Policy Frameworks and Development Impacts , 1999 .

[6]  Craig Langston Estimating the useful life of buildings , 2011 .

[7]  Liyin Shen,et al.  Application of the adaptive reuse potential model in Hong Kong: A case study of Lui Seng Chun , 2007 .

[8]  Brian Atkinson,et al.  RE-USE/UPGRADING OF EXISTING BUILDING STOCK , 1996 .

[9]  Harvey K. Newman Historic Preservation Policy and Regime Politics in Atlanta , 2001 .

[10]  Rick Ball,et al.  Developers, regeneration and sustainability issues in the reuse of vacant industrial buildings , 1999 .

[11]  Craig Langston,et al.  The sustainability implications of building adaptive reuse , 2008 .

[12]  Tony Negline Once is never enough , 2013 .

[13]  Francis K.W. Wong,et al.  Strategic assessment of building adaptive reuse opportunities in Hong Kong , 2008 .

[14]  Ben Ho-Sing Poon Buildings Recycled—City Refurbished , 2001 .

[15]  A. Leone Late Antique North Africa: Production and Changing Use of Buildings in Urban Areas , 2003 .

[16]  N. Gallent,et al.  New uses for England's old airfields , 2000 .