Environmental problems in Malaysia: A view of contractors' perception
暂无分享,去创建一个
[1] Chi Ming Tam,et al. A review on the viable technology for construction waste recycling , 2006 .
[2] Charles J. Kibert,et al. Strategies for successful construction and demolition waste recycling operations , 1997 .
[3] Judith Petts,et al. Waste Management Strategy Development: A Case Study of Community Involvement and Consensus-Building in Hampshire , 1995 .
[4] Ann T. W. Yu,et al. On-site sorting of construction and demolition waste in Hong Kong , 2001 .
[5] Rawshan Ara Begum,et al. A benefit–cost analysis on the economic feasibility of construction waste minimisation: The case of Malaysia , 2006 .
[6] Vivian W. Y Tam,et al. Implementation of environmental management in the Hong Kong construction industry , 2002 .
[7] Rawshan Ara Begum,et al. Implementation of waste management and minimisation in the construction industry of Malaysia , 2007 .
[8] Richard Barnard,et al. Limiting environmental impact by waste management , 1990 .
[9] Rawshan Ara Begum,et al. Factors and values of willingness to pay for improved construction waste management--a perspective of Malaysian contractors. , 2007, Waste management.
[10] Nabil Kartam,et al. Environmental management of construction and demolition waste in Kuwait. , 2004, Waste management.
[11] Arthur J. Caplan,et al. Waste Not or Want Not? A Contingent Ranking Analysis of Curbside Waste Disposal Options , 2002 .
[12] O. O. Faniran,et al. Minimizing waste on construction project sites , 1998 .
[13] N. Erdoğan. Environmental problems and visitor behavior at the Olimpos National Park, Turkey. , 2005 .