Optimal production planning for a multi-product closed loop system with uncertain demand and return
暂无分享,去创建一个
[1] K. Richter,et al. A production/recycling model with quality consideration , 2006 .
[2] Ismail Serdar Bakal,et al. Effects of Random Yield in Remanufacturing with Price‐Sensitive Supply and Demand , 2006 .
[3] K. Inderfurth. Optimal policies in hybrid manufacturing/remanufacturing systems with product substitution , 2004 .
[4] Bongju Jeong,et al. Supply planning model for remanufacturing system in reverse logistics environment , 2006, Comput. Ind. Eng..
[5] Ovidiu Listes,et al. A generic stochastic model for supply-and-return network design , 2007, Comput. Oper. Res..
[6] Rommert Dekker,et al. Inventory Control in Hybrid Systems with Remanufacturing , 1999 .
[7] Vedat Verter,et al. Coordination and Priority Decisions in Hybrid Manufacturing/Remanufacturing Systems , 2006 .
[8] Atalay Atasu,et al. Lot Sizing for Optimal Collection and Use of Remanufacturable Returns over a Finite Life‐Cycle , 2006 .
[9] Ruud H. Teunter,et al. Matching Demand and Supply to Maximize Profits from Remanufacturing , 2003, Manuf. Serv. Oper. Manag..
[10] V. Guide. Production planning and control for remanufacturing: industry practice and research needs , 2000 .
[11] Mohamed Mohamed Naim,et al. Dynamic performance of a hybrid inventory system with a Kanban policy in remanufacturing process , 2006 .
[12] Hark Hwang,et al. A generalized ordering and recovery policy for reusable items , 2007, Eur. J. Oper. Res..
[13] Erwin van der Laan,et al. Leadtime effects and policy improvement for stochastic inventory control with remanufacturing , 2001 .
[14] Albert Corominas,et al. Optimal manufacturing-remanufacturing policies in a lean production environment , 2008, Comput. Ind. Eng..
[15] Shaligram Pokharel,et al. Pricing used products for remanufacturing , 2009, Eur. J. Oper. Res..
[16] Roelof Kuik,et al. On optimal inventory control with independent stochastic item returns , 2003, Eur. J. Oper. Res..
[17] Rommert Dekker,et al. Controlling inventories with stochastic item returns: A basic model , 2002, Eur. J. Oper. Res..
[18] Nico Vandaele,et al. Reverse logistics network design with stochastic lead times , 2007, Comput. Oper. Res..
[19] W. C. Benton,et al. Supply-Chain Management for Recoverable Manufacturing Systems , 2000, Interfaces.
[20] L. V. Wassenhove,et al. MANAGING PRODUCT RETURNS FOR REMANUFACTURING , 2001 .
[21] K. Inderfurth. Impact of uncertainties on recovery behavior in a remanufacturing environment , 2005 .
[22] Luk N. Van Wassenhove,et al. The Economics of Remanufacturing Under Limited Component Durability and Finite Product Life Cycles , 2007, Manag. Sci..
[23] Akshay Mutha,et al. Perspectives in reverse logistics : A review , 2009 .
[24] Vaidyanathan Jayaraman,et al. Production planning for closed-loop supply chains with product recovery and reuse: an analytical approach , 2006 .
[25] Guoqing Zhang,et al. Supply planning for a closed-loop system with uncertain demand and return , 2011 .
[26] Xiuli Qu,et al. An analytical model for reverse automotive production planning and pricing , 2008, Eur. J. Oper. Res..
[27] Patroklos Georgiadis,et al. The Impact of Product Lifecycle on Capacity Planning of Closed‐Loop Supply Chains with Remanufacturing , 2006 .
[28] Gilvan C. Souza,et al. Time Value of Commercial Product Returns , 2006, Manag. Sci..
[29] Maqbool Dada,et al. Pricing and the Newsvendor Problem: A Review with Extensions , 1999, Oper. Res..
[30] Sergio Rubio,et al. Characteristics of the research on reverse logistics (1995–2005) , 2008 .
[31] V. Daniel R. Guide,et al. OR FORUM - The Evolution of Closed-Loop Supply Chain Research , 2009, Oper. Res..