A stochastic programming approach for a multi-site supply chain planning in textile and apparel industry under demand uncertainty

In this study, a new stochastic model is proposed to deal with a multi-product, multi-period, multi-stage, multi-site production and transportation supply chain planning problem under demand uncertainty. A two-stage stochastic linear programming approach is used to maximize the expected profit. Decisions such as the production amount, the inventory level of finished and semi-finished product, the amount of backorder and the quantity of products to be transported between upstream and downstream plants in each period are considered. The robustness of production supply chain plan is then evaluated using statistical and risk measures. A case study from a real textile and apparel industry is shown in order to compare the performances of the proposed stochastic programming model and the deterministic model.

[1]  Nikolaos V. Sahinidis,et al.  Optimization under uncertainty: state-of-the-art and opportunities , 2004, Comput. Chem. Eng..

[2]  Marianthi G. Ierapetritou,et al.  Integrated production planning and scheduling optimization of multisite, multiproduct process industry , 2012, Comput. Chem. Eng..

[3]  S. Chopra,et al.  Supply Chain Management: Strategy, Planning & Operation , 2007 .

[4]  Seyed Jafar Sadjadi,et al.  A Multiobjective Stochastic Production-Distribution Planning Problem in an Uncertain Environment Considering Risk and Workers Productivity , 2011 .

[5]  Faouzi Masmoudi,et al.  Multi-objective Optimization of a Multi-site Manufacturing Network , 2014 .

[6]  Peter Kall,et al.  Stochastic Programming , 1995 .

[7]  Kin Keung Lai,et al.  A stochastic programming approach for multi-site aggregate production planning , 2006, J. Oper. Res. Soc..

[8]  Costas D. Maranas,et al.  A Two-Stage Modeling and Solution Framework for Multisite Midterm Planning under Demand Uncertainty , 2000 .

[9]  Jun Zhang,et al.  Stochastic production planning for a biofuel supply chain under demand and price uncertainties , 2013 .

[10]  James T. Lin,et al.  A multi-site supply network planning problem considering variable time buckets– A TFT-LCD industry case , 2007 .

[11]  Karuna Jain,et al.  Supply chain planning using multi‐stage stochastic programming , 2008 .

[12]  K. Lai,et al.  Multi-site aggregate production planning with multiple objectives: A goal programming approach , 2003 .

[13]  S. Karabuk Production planning under uncertainty in textile manufacturing , 2008, J. Oper. Res. Soc..

[14]  S. Zenios,et al.  CVaR models with selective hedging for international asset allocation , 2002 .

[15]  Antonella Meneghetti,et al.  The production planning process for a network of firms in the textile-apparel industry , 2000 .

[16]  Cheng-Hung Wu,et al.  A stochastic programming model for strategic capacity planning in thin film transistor-liquid crystal display (TFT-LCD) industry , 2011, Comput. Oper. Res..

[17]  John R. Birge,et al.  Introduction to Stochastic Programming , 1997 .

[18]  Mir-Bahador Aryanezhad,et al.  A multi-objective robust optimization model for multi-product multi-site aggregate production planning in a supply chain under uncertainty , 2011 .

[19]  George B. Dantzig,et al.  Linear Programming Under Uncertainty , 2004, Manag. Sci..

[20]  M. Ierapetritou,et al.  Robust short-term scheduling of multiproduct batch plants under demand uncertainty , 2001 .