The design of semi-autogenous grinding (SAG) mill based comminution circuits for the treatment of competent ores, similar to those at Geita and Boddington, involves the same process of sample selection, test work, data analysis and data modelling/interpretation as that used for ‘average’ competency ores. However, over the past couple of years a number of issues have arisen that are common to the design of circuits for the comminution of ‘highly’ competent ores. The impact of these issues on project viability is generally more pronounced when treating hard ores than average to soft ores due to the greater impact on capital and operating costs. The issues encountered have included: • standard test procedures have been modified; • test equipment has worn or been damaged; • different procedures yield different data and varying interpretation; and • modelling and empirical calculations have been based on poor benchmarks, or used incorrectly in the case of JKSimMet, yielding misleading outcomes. The purpose of this paper is to present, discuss and clarify some of the issues associated with conducting test work and designing comminution circuits for the treatment of ‘highly’ competent ores in order to reduce the level of conflict arising from interpretation and application of test work data. Specifically, the issues associated with the bond crushing (impact) and rod work indices measurement, the various SAG mill specific energy tests, and the interpretation of the resulting data will be discussed in the context of case studies.
[1]
W. Valery,et al.
Design of the 40 foot diameter SAG mill installed at the Cadia gold copper mine
,
2001
.
[2]
S. Morrell,et al.
Predicting the specific energy of autogenous and semi-autogenous mills from small diameter drill core samples
,
2004
.
[3]
Stephen Morrell.
A method for predicting the specific energy requirement of comminution circuits and assessing their energy utilisation efficiency
,
2008
.
[4]
W. Valery,et al.
Optimisation of the Cadia Hill SAG mill circuit
,
2001
.
[5]
G. Lane,et al.
Design of the biggest mill in the world
,
2000
.
[6]
S. Stark,et al.
JK drop weight parameters: A statistical analysis of their accuracy and precision and the effect on SAG mill comminution circuit simulation
,
2008
.
[7]
S. Morrell,et al.
Mineral comminution circuits: their operation and optimisation
,
1996
.