Operation sequence and tool selection in flexible manufacturing systems under dynamic tool allocation
暂无分享,去创建一个
[1] Pyung-Hoi Koo. Flow planning and control of single-stage multimachine systems , 1996 .
[2] Averill M. Law,et al. Simulation Modeling and Analysis , 1982 .
[3] Kwasi Amoako-Gyampah,et al. A comparison of tool management strategies and part selection rules for a flexible manufacturing system , 1992 .
[4] Chen-Hua Chung,et al. Planning tool requirements for flexible manufacturing systems , 1991 .
[5] Quirico Semeraro,et al. Simulation of tool and part flow in FMSs , 1995 .
[6] R. Geelink,et al. An Integrated Cutting Tool Selection and Operation Sequencing Method , 1992 .
[7] Jaromir Zelený. Flexible Manufacturing Systems with Automatic Transport of Tools , 1981 .
[8] G. J. Gaalman,et al. Tool sharing in an FMS—A feasibility study , 1987 .