Scheduling Inspection Operations subject to a Fixed Production Schedule
暂无分享,去创建一个
[1] Yves Tabourier. Problème d'ordonnancement à contraintes purement disjonctives , 1969 .
[2] J. Carlier. The one-machine sequencing problem , 1982 .
[3] Stéphane Dauzère-Pérès,et al. Using Lagrangean relaxation to minimize the weighted number of late jobs on a single machine , 2003 .
[4] Shunji Tanaka,et al. An efficient exact algorithm for general single-machine scheduling with machine idle time , 2008, 2008 IEEE International Conference on Automation Science and Engineering.
[5] Philippe Baptiste,et al. Dominance-based heuristics for one-machine total cost scheduling problems , 2008, Eur. J. Oper. Res..
[6] R. L. Bulfin,et al. Minimizing the weighted number of tardy jobs on parallel processors , 2005, Eur. J. Oper. Res..