文
论文分享
演练场
杂货铺
论文推荐
字
编辑器下载
登录
注册
Test and Research Done to Increase Load Response Speed of Coordination Control System
复制论文ID
分享
摘要
作者
参考文献
暂无分享,去
创建一个
The reason of raising CCS's Load response speed is discussed.Taking NO.3 Unit of Yangquan NO.2 Power Plant as an example,test and simulation for system and improvement plans are analyzed in detail.The operating effect of the system is evaluated.
Chen Feng
|
Kong Zhao
保存到论文桶