Horizontal Well Drilling and Completion Schemes Consider Future Stimulation to Optimize Production
暂无分享,去创建一个
[1] M. Mayerhofer,et al. Tiltmeter Hydraulic Fracture Mapping in the North Robertson Field, West Texas , 2000 .
[2] Jim B. Surjaatmadja,et al. Consideration for Future Stimulation Options is Vital in Deciding Horizontal Well Drilling and Completion Schemes for Production Optimization , 2006 .
[3] Christopher A. Wright,et al. Analysis and Prediction of Microseismicity Induced by Hydraulic Fracturing , 2004 .
[4] Jim B. Surjaatmadja,et al. Effective Stimulation of Multilateral Completions in the James Lime Formation Achieved by Controlled Individual Placement of Numerous Hydraulic Fractures , 2003 .
[5] Norman R. Warpinski,et al. Altered-Stress Fracturing , 1989 .
[6] Jim B. Surjaatmadja,et al. First Applications of a Multiple Fracturing Method in Noncemented Horizontal Offshore Wells , 2005 .