Interrelationships among critical factors of work flow reliability in lean construction
暂无分享,去创建一个
Xi Chen | Lianying Zhang | Yongqing Suo | Lianying Zhang | Xi Chen | Y. Suo
[1] Luis F. Alarcón,et al. Improving Planning Reliability and Project Performance using the Reliable Commitment Model. , 2010 .
[2] Hyun-Soo Lee,et al. Impact of Labor Factors on Workflow , 2004 .
[3] Wei Tong Chen,et al. Analyzing relationships among success variables of construction partnering using structural equation modeling: a case study of Taiwan's construction industry , 2012 .
[4] H R Thomas. SCHEDULE ACCELERATION, WORK FLOW, AND LABOR PRODUCTIVITY , 2000 .
[5] A. Bakker. The work-related flow inventory: Construction and initial validation of the WOLF , 2008 .
[6] Rafael Sacks,et al. Visualization of Work Flow to Support Lean Construction , 2009 .
[7] Glenn Ballard,et al. Work Flow Variation and Labor Productivity: Case Study , 2011 .
[8] Iris D. Tommelein,et al. PARADE GAME :I MPACT OF WORK FLOW VARIABILITY ON TRADE PERFORMANCE , 1999 .
[9] Faisal Manzoor Arain,et al. Causes of variation orders in construction projects in the Gaza Strip , 2010 .
[10] Kyoungmin Kim,et al. Case Study on the Evaluation of Equipment Flow at a Construction Site , 2010 .
[11] Rafael Sacks,et al. Measuring information flow in the detailed design of construction projects , 2010 .
[12] Ivica Završki,et al. Reducing Variability to Improve Performance as a Lean Construction Principle , 2002 .
[13] Hemanta Doloi,et al. Cost Overruns and Failure in Project Management: Understanding the Roles of Key Stakeholders in Construction Projects , 2013 .
[14] Liyin Shen,et al. Key Factors Considered in Compiling Tender Prices for China’s Public Works Projects , 2013 .
[15] Junying Liu,et al. Interrelationships among Critical Success Factors of Construction Projects Based on the Structural Equation Model , 2012 .
[16] Jaehyun Choi,et al. Workflow management and productivity control for asphalt pavement operations , 2006 .
[17] Panagiotis Mitropoulos,et al. Critical Concerns of Production Control System on Projects with Labor Constraints: Lessons from a Residential Case Study , 2010 .
[18] Peihua Zhang,et al. Explaining Knowledge-Sharing Intention in Construction Teams in Hong Kong , 2013 .
[19] David Arditi,et al. Factors That Affect Transaction Costs in Construction Projects , 2013 .
[20] Albert P.C. Chan,et al. Determining safety climate factors in the repair, maintenance, minor alteration, and addition sector of Hong Kong , 2013 .
[21] Ossama Salem,et al. Lean Construction: From Theory to Implementation , 2006 .
[22] Jennifer S. Shane,et al. Comparative Analysis of Lean Construction with Design-Build Using a Framework of Contractual Forms of Agreement , 2012 .
[23] Sai On Cheung,et al. Withdrawal in Construction Project Dispute Negotiation , 2011 .
[24] Min Liu,et al. Causes of Variation in Construction Project Task Starting Times and Duration , 2011 .
[25] Iris D. Tommelein,et al. Improving Labor Flow Reliability for Better Productivity as Lean Construction Principle , 2003 .