Interrelationships among critical factors of work flow reliability in lean construction

AbstractWork flow in lean construction has a significant influence on project performance. Uncertain work flow will lead to waste and reduce labor productivity. Reliable work flow will contribute to improving project performance. We found twenty variables affecting work flow reliability by literature review. In order to identify critical factors of work flow reliability and explore interrelationships among them, we designed a questionnaire to collect data, applied factor analysis to identifying critical factors, and put forward hypotheses on the basis of previous research and applied structural equation model (SEM) to exploring interrelationships among the critical factors of work flow. Final model confirmed nine hypotheses and denied three hypotheses. Besides, this paper discovered other interrelationship among the critical factors except for the hypotheses. The result of this research will help project managers understand work flow easily and take effective measures to improve work flow reliability, whi...

[1]  Luis F. Alarcón,et al.  Improving Planning Reliability and Project Performance using the Reliable Commitment Model. , 2010 .

[2]  Hyun-Soo Lee,et al.  Impact of Labor Factors on Workflow , 2004 .

[3]  Wei Tong Chen,et al.  Analyzing relationships among success variables of construction partnering using structural equation modeling: a case study of Taiwan's construction industry , 2012 .

[4]  H R Thomas SCHEDULE ACCELERATION, WORK FLOW, AND LABOR PRODUCTIVITY , 2000 .

[5]  A. Bakker The work-related flow inventory: Construction and initial validation of the WOLF , 2008 .

[6]  Rafael Sacks,et al.  Visualization of Work Flow to Support Lean Construction , 2009 .

[7]  Glenn Ballard,et al.  Work Flow Variation and Labor Productivity: Case Study , 2011 .

[8]  Iris D. Tommelein,et al.  PARADE GAME :I MPACT OF WORK FLOW VARIABILITY ON TRADE PERFORMANCE , 1999 .

[9]  Faisal Manzoor Arain,et al.  Causes of variation orders in construction projects in the Gaza Strip , 2010 .

[10]  Kyoungmin Kim,et al.  Case Study on the Evaluation of Equipment Flow at a Construction Site , 2010 .

[11]  Rafael Sacks,et al.  Measuring information flow in the detailed design of construction projects , 2010 .

[12]  Ivica Završki,et al.  Reducing Variability to Improve Performance as a Lean Construction Principle , 2002 .

[13]  Hemanta Doloi,et al.  Cost Overruns and Failure in Project Management: Understanding the Roles of Key Stakeholders in Construction Projects , 2013 .

[14]  Liyin Shen,et al.  Key Factors Considered in Compiling Tender Prices for China’s Public Works Projects , 2013 .

[15]  Junying Liu,et al.  Interrelationships among Critical Success Factors of Construction Projects Based on the Structural Equation Model , 2012 .

[16]  Jaehyun Choi,et al.  Workflow management and productivity control for asphalt pavement operations , 2006 .

[17]  Panagiotis Mitropoulos,et al.  Critical Concerns of Production Control System on Projects with Labor Constraints: Lessons from a Residential Case Study , 2010 .

[18]  Peihua Zhang,et al.  Explaining Knowledge-Sharing Intention in Construction Teams in Hong Kong , 2013 .

[19]  David Arditi,et al.  Factors That Affect Transaction Costs in Construction Projects , 2013 .

[20]  Albert P.C. Chan,et al.  Determining safety climate factors in the repair, maintenance, minor alteration, and addition sector of Hong Kong , 2013 .

[21]  Ossama Salem,et al.  Lean Construction: From Theory to Implementation , 2006 .

[22]  Jennifer S. Shane,et al.  Comparative Analysis of Lean Construction with Design-Build Using a Framework of Contractual Forms of Agreement , 2012 .

[23]  Sai On Cheung,et al.  Withdrawal in Construction Project Dispute Negotiation , 2011 .

[24]  Min Liu,et al.  Causes of Variation in Construction Project Task Starting Times and Duration , 2011 .

[25]  Iris D. Tommelein,et al.  Improving Labor Flow Reliability for Better Productivity as Lean Construction Principle , 2003 .