This paper discusses the multi-product multi-level capacitated lotsizing and scheduling problem with sequence-dependent setups. An exact formulation of the problem is provided as a mixed-integer program which is impractical to solve in reasonable computing time for non-small instances. To solve non-small instances of the problem, MIP-based heuristics are provided. To test the accuracy of heuristics, two lower bounds are developed and compared against the optimal solution. The trade-offs between schedule quality and computational time of heuristics are also provided.

[1]  G. D. Eppen,et al.  Solving Multi-Item Capacitated Lot-Sizing Problems Using Variable Redefinition , 1987, Oper. Res..

[2]  Alistair R. Clark,et al.  Lot sizing and furnace scheduling in small foundries , 2008, Comput. Oper. Res..

[3]  G. Fontan,et al.  MIP-BASED HEURISTICS FOR CAPACITATED LOTSIZING PROBLEMS , 2003 .

[4]  Herbert Meyr,et al.  The general lotsizing and scheduling problem , 1997 .

[5]  Alistair Clark,et al.  Optimization approximations for capacity constrained material requirements planning , 2003 .

[6]  Harvey M. Wagner,et al.  Dynamic Version of the Economic Lot Size Model , 2004, Manag. Sci..

[7]  Alf Kimms,et al.  Some insights into proportional lot sizing and scheduling , 1998, J. Oper. Res. Soc..

[8]  D. Klabjan,et al.  Single machine multi-product capacitated lot sizing with sequence-dependent setups , 2007 .

[9]  Mingyuan Chen,et al.  A linear programming embedded genetic algorithm for an integrated cell formation and lot sizing considering product quality , 2008, Eur. J. Oper. Res..

[10]  Patrizia Beraldi,et al.  Rolling-horizon and fix-and-relax heuristics for the parallel machine lot-sizing and scheduling problem with sequence-dependent set-up costs , 2008, Comput. Oper. Res..

[11]  Alf Kimms,et al.  Lot sizing and scheduling -- Survey and extensions , 1997 .

[12]  Wu Zhang,et al.  On practical resource allocation for production planning and scheduling with period overlapping setups , 1994 .

[13]  Horst Tempelmeier,et al.  Dynamic multi-machine lotsizing and sequencing with simultaneous scheduling of a common setup resource , 2008 .

[14]  Alistair R. Clark,et al.  Joint rolling-horizon scheduling of materials processing and lot-sizing with sequence-dependent setups , 2007, J. Heuristics.

[15]  Günter Fandel,et al.  Simultaneous lot sizing and scheduling for multi-product multi-level production , 2006 .

[16]  John M. Wilson,et al.  The capacitated lot sizing problem: a review of models and algorithms , 2003 .

[17]  Zeger Degraeve,et al.  Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches , 2004, Eur. J. Oper. Res..

[18]  Diwakar Gupta,et al.  The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times , 2005, Comput. Oper. Res..

[19]  Alf Kimms,et al.  Multi-level, single-machine lot sizing and scheduling (with initial inventory) , 1996 .

[20]  G. Nemhauser,et al.  Integer Programming , 2020 .

[21]  A. Clark,et al.  Rolling-horizon lot-sizing when set-up times are sequence-dependent , 2000 .