Continuous Improvement of Industrial Engineering Education Based on PDCA Method and Structural Importance

Industrial engineering has played an important role in all fields of industry since its emergence in the early 20th century. The industrial engineering education in universities of China originated in 1992. Although it has developed rapidly, there is still a far distance from foreign universities. Industrial engineering education must be improved continuously. This is the only way to make the industrial engineering students meet the requests of industrial manufacturing. First of all, the industrial engineering teaching program of Northwestern Polytechnical University, China is studied in this paper using the PDCA (plan-do-check-action) cycle model. Next, we analysis structural importance of different courses that to obtain their influence degrees on undergraduate education. Then, the optimization of industrial engineering education can be optimized. Finally, correctness and validity of this model can be verified through the comparative analysis of questionnaires and the 2013, 2014 industrial engineering teaching program of Northwestern Polytechnical University.

[1]  Moti Frank,et al.  The T-Shape dilemma in industrial engineering and management curriculum , 2014 .

[2]  Hu Ming,et al.  Study on Software Quality Improvement based on Rayleigh Model and PDCA Model , 2013 .

[3]  N. Graham,et al.  The importance of structural complexity in coral reef ecosystems , 2012, Coral Reefs.

[4]  Schneider Pd FOCUS-PDCA ensures continuous quality improvement in the outpatient setting. , 1997 .

[5]  Lesley Strawderman,et al.  Designing Introductory Industrial Engineering Courses to Improve Student Career Efficacy , 2011 .

[6]  Dragana Stojanović,et al.  PRODUCTIVITY UPSWING THROUGH TWO-PHASE CONTINUOUS PROCESS IMPROVEMENT MODEL: THE CASE OF APPAREL MANUFACTURER , 2015 .

[7]  Tetsuo Fuchino,et al.  Process Safety Management Based on the Business Process Model of Engineering Activities , 2015 .

[8]  Moti Frank,et al.  The T-Shape Dilemma in the Industrial Engineering and Management , 2014 .

[9]  B Kruse,et al.  [PDCA cyclus and morbidity and mortality conference as a basic tool for reduction of wound infection in colorectal surgery]. , 2010, Zentralblatt fur Chirurgie.

[10]  Oswaldo Hideo Ando Junior,et al.  Design of a Didatic Workbench of Industrial Automation Systems for Engineering Education , 2017, IEEE Latin America Transactions.

[11]  Avraham Shtub,et al.  Teaching supply chain management to industrial engineering students: mixed vs. Pure approaches in simulation based training , 2015 .

[12]  D. Stead,et al.  A critical review of rock slope failure mechanisms: The importance of structural geology , 2015 .

[13]  P D Schneider,et al.  FOCUS-PDCA ensures continuous quality improvement in the outpatient setting. , 1997, Oncology nursing forum.

[14]  Jian Sun,et al.  Preliminary experience of a PDCA-cycle and quality management based training curriculum for rat liver transplantation. , 2012, The Journal of surgical research.

[15]  Karmen Kern Pipan,et al.  of Achievements in Materials and Manufacturing Engineering Quality Improvement Methodologies – PDCA Cycle , RADAR Matrix , DMAIC and DFSS , 2010 .