User Costs in Life-Cycle Cost-Benefit (LCCB) Analysis of Bridges
暂无分享,去创建一个
[1] Palle Thoft-Christensen,et al. Advanced bridge management systems , 1995 .
[2] Neil G. Thompson,et al. CORROSION COST AND PREVENTIVE STRATEGIES IN THE UNITED STATES , 2002 .
[3] W R Stockton,et al. TECHNIQUES FOR MANUALLY ESTIMATING ROAD USER COSTS ASSOCIATED WITH CONSTRUCTION PROJECTS , 1999 .
[4] Brad W. Rister,et al. The Cost of Construction Delays and Traffic Control for Life-Cycle Cost Analysis of Pavements , 2002 .
[5] Paul D Thompson,et al. DEVELOPMENT OF USER COST DATA FOR FLORIDA'S BRIDGE MANAGEMENT SYSTEM , 1999 .
[6] P. Thoft-Christensen,et al. Stochastic Modeling and Optimization of Complex Infrastructure Systems , 2003, System Modelling and Optimization.
[7] Palle Thoft-Christensen,et al. Optimal Strategy for Maintenance of Concrete Bridges using Expert Systems , 1993 .
[8] Palle Thoft-Christensen. A Simplified Preventive Maintenance Strategy for Concrete Bridges , 2004 .