Exploring performance of the integrated project delivery process on complex building projects

Abstract Many building projects do not meet owners' performance expectations. Integrated project delivery (IPD) has emerged as a new delivery system with the potential to provide better performance through more supply chain integration. However, there is a knowledge gap surrounding how project delivery systems, IPD in particular, affect supply chain relationships and potential project performance. To fill this gap, we applied a simulation method, General Performance Model (GPM), to assess the interactions between numerous project delivery variables and compare potential performance between delivery systems. This study presents a GPM analysis of a complex hospital project and based upon cross-impact assessments by owners, architects, constructors, and specialty contractors from the building industry. The results found the most influential drivers of project delivery performance to be communication, alignment of interest and objectives, team working, trust, and gain/pain sharing. The performance of the supply chain was found to drive the project delivery performance.

[1]  Robert D. Gilbreath Managing construction contracts: Operational controls for commercial risks , 1983 .

[2]  Iris D. Tommelein,et al.  Collaborating with a Permitting Agency to Deliver a Healthcare Project: Case Study of the Sutter Medical Center Castro Valley (SMCCV) , 2011 .

[3]  Luis F. Alarcón,et al.  PERFORMANCE MODELING FOR CONTRACTOR SELECTION , 2002 .

[4]  Alfonso Bastías,et al.  A computer environment to support the strategic decision‐making process in construction firms , 2000 .

[5]  Luis F. Alarcón,et al.  Modeling project performance for decision making , 1996 .

[6]  Mohan M. Kumaraswamy,et al.  Relational Contracting and Teambuilding: Assessing Potential Contractual and Noncontractual Incentives , 2008 .

[7]  Akintola Akintoye,et al.  An analysis of success factors and benefits of partnering in construction , 2000 .

[8]  Jim Brown Partnering to Save Troubled Projects , 1994 .

[9]  Peter E.D. Love,et al.  Risk/Reward Compensation Model for Civil Engineering Infrastructure Alliance Projects , 2011 .

[10]  Xianhai Meng,et al.  The effect of relationship management on project performance in construction , 2012 .

[11]  Awad S. Hanna,et al.  Quantifying Performance for the Integrated Project Delivery System as Compared to Established Delivery Systems , 2013 .

[12]  Christine Pasquire,et al.  Target value design: using collaboration and a lean approach to reduce construction cost , 2012 .

[13]  John A. Gambatese,et al.  Qualitative Research: Application of the Delphi Method to CEM Research , 2010 .

[14]  Keith R. Molenaar,et al.  A Hybrid Cross-Impact Approach to Predicting Cost Variance of Project Delivery Decisions for Highways , 2016 .

[15]  Peter E.D. Love,et al.  Establishment of Critical Success Factors for Construction Partnering , 2000 .

[16]  Peter E.D. Love,et al.  Co-operative benchmarking: a tool for partnering excellence in construction , 2001 .

[17]  Luis F. Alarcón,et al.  Project management decision making using cross-impact analysis , 1998 .

[18]  Xiaolong Xue,et al.  Critical Review of Collaborative Working in Construction Projects: Business Environment and Human Behaviors , 2010 .

[19]  Steve Rowlinson,et al.  How important is cooperation to construction project success? A grounded empirical quantification , 2004 .

[20]  Panagiotis Mitropoulos,et al.  Management-Driven Integration , 2000 .

[21]  Colin Duffield,et al.  Partnering mechanism in construction: An empirical study on the Chinese construction industry , 2006 .

[22]  Matthew R. Hallowell,et al.  Interrelationships among Construction Injury Prevention Strategies: A Cross-Impact Analysis , 2010 .

[23]  Xiaodong Li,et al.  An agent-based framework for supply chain coordination in construction , 2005 .

[24]  William A. Lichtig,et al.  The Integrated Agreement for Lean Project Delivery , 2010 .

[25]  Steve Rowlinson,et al.  Success factors in an alliancing contract : a case study in Australia , 2005 .

[26]  Per Erik Eriksson,et al.  Effects of cooperative procurement procedures on construction project performance: A conceptual framework , 2011 .

[27]  T. Das,et al.  Between Trust and Control: Developing Confidence in Partner Cooperation in Alliances , 1998 .

[28]  Xianhai Meng,et al.  Maturity Model for Supply Chain Relationships in Construction , 2011 .

[29]  Albert P.C. Chan,et al.  Exploring Critical Success Factors for Partnering in Construction Projects , 2004 .

[30]  Vivian W. Y Tam,et al.  Implementation of environmental management in the Hong Kong construction industry , 2002 .

[31]  C Patricio Venegas,et al.  Selecting Long-Term Strategies for Construction Firms , 1997 .

[32]  G. Edward Gibson,et al.  Empirical Comparison of Design/Build and Design/Bid/Build Project Delivery Methods , 2009 .

[33]  Albert P.C. Chan,et al.  An empirical study of the benefits of construction partnering in Hong Kong , 2003 .

[34]  Asce Quality in the Constructed Project : a Guide for Owners, Designers and Constructors , 1990 .

[35]  Raymond J. Cole,et al.  Building environmental assessment methods: assessing construction practices , 2000 .

[36]  Mohan M. Kumaraswamy,et al.  Building a relational contracting culture and integrated teams , 2007 .

[37]  C. William Ibbs,et al.  Project delivery systems and project change: Quantitative analysis , 2003 .

[38]  K. N. Jha,et al.  Factors affecting cost performance: evidence from Indian construction projects , 2005 .

[39]  Mark Konchar,et al.  Comparison of U.S. Project Delivery Systems , 1998 .

[40]  Derek H.T. Walker,et al.  Procurement strategies : a relationship-based approach , 2003 .

[41]  E. W. Larson,et al.  Partnering on construction projects: a study of the relationship between partnering activities and project success , 1997 .

[42]  T. Yiu,et al.  A framework for trust in construction contracting , 2008 .

[43]  M. Christopher Logistics and Supply Chain Management: Strategies for Reducing Cost and Improving Service (Second Edition) , 1999 .

[44]  Sai On Cheung,et al.  Effective partnering tools in construction: a case study on MTRC TKE contract 604 in Hong Kong , 2004 .