DESIGN OF A PERIOD BATCH CONTROL PLANNING SYSTEM FOR CELLULAR MANUFACTURING
暂无分享,去创建一个
[1] D. C. Steele,et al. Period Batch Control Systems For Cellular Manufacturing , 1998 .
[2] A. M. van de Wakker. Throughput time control and due date reliability in tool & die shops , 1993 .
[3] C. L. Ang,et al. Computer Simulation of the Effects of Inter-Cell Workload Transfer on the Performance of GT Systems , 1981 .
[4] Andrew Kusiak,et al. Group technology , 1987 .
[5] Harold J. Steudel,et al. Manufacturing in the Nineties: How to Become a Mean, Lean, World-Class Competitor , 1991 .
[6] Stephen N. Chapman,et al. Planning and Control in Multi‐Cell Manufacturing , 1995 .
[7] A. Rosenfeld,et al. IEEE TRANSACTIONS ON SYSTEMS , MAN , AND CYBERNETICS , 2022 .
[8] R. W. West. POLYNOMIAL TRANSFER LOT SIZING TECHNIQUES FOR BATCH PROCESSING ON CONSECUTIVE MACHINES , .
[9] D. C. Steele,et al. Factors affecting performance of period batch control systems incellular manufacturing , 1997 .
[10] W. Monhemius. Historische ontwikkeling van de industriële logistiek , 1989 .
[11] Lawrence M. Wein,et al. A broader view of the job-shop scheduling problem , 1992 .
[12] John L. Burbidge. Operation scheduling with GT and PBC , 1988 .
[13] John L. Burbidge. Period Batch Control , 1988, Computer-Aided Production Management.
[14] Jeff Hoi Yan Yeung,et al. Parameters affecting the effectiveness of MRP systems: A review , 1998 .
[15] J. Ouenniche,et al. SEQUENCING, LOT SIZING AND SCHEDULING OF SEVERAL PRODUCTS IN JOB SHOPS : THE COMMON CYCLE APPROACH , 1998 .
[16] Cornelius Arnoldus Theodorus Takkenberg. Planning en methode van onderzoek , 1983 .
[17] E. Trist,et al. Autonomy at work: A sociotechnical analysis of participative management , 1976 .
[18] V. Sridharan,et al. Master production scheduling make-to-stock products: a framework for analysis , 1990 .
[19] Nancy Lea Hyer,et al. MRP/GT: a framework for production planning and control of cellular manufacturing , 1982 .
[20] Gerard Gaalman,et al. Relations between cells in cellular manufacturing , 1995 .
[21] J. Riezebos. On the Determination of the Period Length in a Period Batch Control System , 1997 .
[22] I. Winfield. Japanese manufacturing techniques , 1994 .
[23] L. G. Mitten. Sequencing n Jobs on Two Machines with Arbitrary Time Lags , 1959 .
[24] James D. Thompson. Organizations in Action: Social Science Bases of Administrative Theory , 1967 .
[25] Avraham Shtub. Lot sizing in MRP/GT systems , 1990 .
[26] Asoo J. Vakharia,et al. A comparative investigation of hierarchical clustering techniques and dissimilarity measures applied to the cell formation problem , 1995 .
[27] Y. Sugimori,et al. Toyota production system and Kanban system Materialization of just-in-time and respect-for-human system , 1977 .
[28] Jan Riezebos,et al. Time lag size in multiple operations flow shop scheduling heuristics , 1998, Eur. J. Oper. Res..
[29] Loren Paul Rees,et al. A comparative analysis of an MRP lot-for-lot system and a Kanban system for a multistage production operation , 1989 .
[30] John L. Burbidge,et al. Production flow analysis for planning group technology , 1991 .
[31] Nallan C. Suresh,et al. Coping with the Loss of Pooling Synergy in Cellular Manufacturing Systems , 1994 .
[32] Kum Khiong Yang,et al. Comparison of Make-to-Order Job Shops with Different Machine Layouts and Production Control Systems , 1992 .
[33] J. Carlier. The one-machine sequencing problem , 1982 .
[34] Jatinder N. D. Gupta,et al. Flow shop scheduling with multiple operations and time lags , 1995, J. Intell. Manuf..
[35] John L. Burbidge. Group Technology (GT): Where Do we Go from Here? , 1993, APMS.