A heuristic algorithm for schedule reconfiguration of projects during Execution
暂无分享,去创建一个
[1] Roland Heilmann,et al. Discrete Optimization A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags , 2002 .
[2] Fayez F. Boctor,et al. A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes , 1996 .
[3] Jirachai Buddhakulsomsiri,et al. Priority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting , 2007, Eur. J. Oper. Res..
[4] Houshang Darabi,et al. Petri Net based Supervisory Control Reconfiguration of Project Management Systems , 2007, 2007 IEEE International Conference on Automation Science and Engineering.
[5] Mauro Mancini,et al. An improved multi-mode resource allocation and project scheduling model , 2008, 2008 IEEE International Conference on Automation Science and Engineering.
[6] Juite Wang,et al. Constraint-based schedule repair for product development projects with time-limited constraints , 2005 .
[7] Arno Sprecher,et al. Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm , 1998, Eur. J. Oper. Res..
[8] Salah E. Elmaghraby,et al. Activity networks: Project planning and control by network models , 1977 .
[9] Christian Artigues,et al. A polynomial activity insertion algorithm in a multi-resource schedule with cumulative constraints and multiple modes , 2000, Eur. J. Oper. Res..
[10] Arno Sprecher,et al. Resource-Constrained Project Scheduling: Exact Methods for the Multi-Mode Case , 1994 .
[11] Reha Uzsoy,et al. Executing production schedules in the face of uncertainties: A review and some future directions , 2005, Eur. J. Oper. Res..
[12] Roman Słowiński,et al. Solving the general project scheduling problem with multiple constrained resources by mathematical programming , 1978 .