A linear programming model for integrated steel production and distribution planning

Develops a linear programming model for integrated production planning based on the practice of a major Canadian steel making company. Considers the entire planning activity in the company as an integrated process involving a number of closely related sub‐functions, such as raw material purchasing, semi‐finished product purchasing and production, and capacity allocation, as well as finished product production and distribution. The mathematical programming model takes into account production costs, product throughput rates, customer demands, sales prices and facility capacities for optimal production planning. Presents a numerical example based on realistic system structure and practical planning data to illustrate the model. Computation results and analysis show that the integrated methodology is a feasible and practical approach for steel production planning.

[1]  Colin L. Moodie,et al.  Hierarchical production planning for a modern steel manufacturing system , 1989 .

[2]  Clarence H. Martin,et al.  Integrated Production, Distribution, and Inventory Planning at Libbey-Owens-Ford , 1993 .

[3]  A. G. Beged-dov Determination of optimal product mix by marginal analysis , 1983 .

[4]  R. P. Mohanty,et al.  A Hierarchical Production Planning Approach for a Steel Manufacturing System , 1992 .

[5]  Fred Glover,et al.  An Integrated Production, Distribution, and Inventory Planning System , 1979 .

[6]  Ludo Gelders,et al.  Production planning: a review , 1981 .

[7]  Katsundo Hitomi,et al.  Strategic integrated manufacturing systems: the concept and structures , 1991 .

[8]  Tan Miller,et al.  Implementing Integrated Production and Distribution Planning Systems , 1988 .

[9]  K. K. Achary,et al.  A multiple arc network model of production planning in a steel mill , 1991 .

[10]  K. Kendall,et al.  Managing with micros: Management uses of microcomputers: Colin LEWIS Blackwell, Oxford, 1984, Second edition, viii + 200 pages, £6.95 (paperback) , 1985 .

[11]  K. K. Achary,et al.  Applications of O.R. techniques in cost allocation of major operational materials in an alloy and special steel manufacturing unit , 1991 .

[12]  Pakorn Adulbhan,et al.  An aggregate production planning for a heavy manufacturing industry , 1981 .

[13]  Friedrich Wilhelm Bielefeld,et al.  A Computer-Based Strategic Planning System for Steel Production , 1986 .

[14]  Nigel Ware Integrated Manufacturing Planning , 1992 .

[15]  Marc J. Schniederjans,et al.  Multi-product production planning: A goal programming approach , 1985 .