Optimal Job Releasing and Sequencing for a Reentrant Manufacturing Line with Finite Capacity Buffers
暂无分享,去创建一个
[1] C. R. Glassey,et al. Linear control rules for production control of semiconductor fabs , 1996 .
[2] Martin Land,et al. Workload control concepts in job shops A critical assessment , 1995 .
[3] S. T Enns,et al. The effectiveness of input control based on aggregate versus bottleneck work loads , 2002 .
[4] Martin L. Puterman,et al. Markov Decision Processes: Discrete Stochastic Dynamic Programming , 1994 .
[5] Steven A. Lippman,et al. Applying a New Device in the Optimization of Exponential Queuing Systems , 1975, Oper. Res..
[6] Peter Nyhuis,et al. The workload control concept: theory and practical extensions of Load Oriented Order Release , 2002 .
[7] Reha Uzsoy,et al. A review of production planning and scheduling models in the semiconductor industry , 1994 .
[8] J.-B. Suk,et al. Optimal control of a storage-retrieval queuing system , 1989, Proceedings of the 28th IEEE Conference on Decision and Control,.
[9] David L. Woodruff,et al. CONWIP: a pull alternative to kanban , 1990 .
[10] P. R. Kumar,et al. Re-entrant lines , 1993, Queueing Syst. Theory Appl..
[11] Don T. Phillips,et al. A comparison of order release strategies in production control systems , 1992 .
[12] Sunil Kumar,et al. Queueing network models in the design and analysis of semiconductor wafer fabs , 2001, IEEE Trans. Robotics Autom..
[13] Sean P. Meyn,et al. Value iteration and optimization of multiclass queueing networks , 1999, Queueing Syst. Theory Appl..
[14] Guy Pujolle,et al. Introduction to queueing networks , 1987 .
[15] John N. Tsitsiklis,et al. The complexity of optimal queueing network control , 1994, Proceedings of IEEE 9th Annual Conference on Structure in Complexity Theory.
[16] Gary L. Hogg,et al. Workload control in the semiconductor industry , 2002 .
[17] Lawrence M. Wein,et al. Scheduling semiconductor wafer fabrication , 1988 .
[18] John N. Tsitsiklis,et al. Neuro-Dynamic Programming , 1996, Encyclopedia of Machine Learning.
[19] J.A. Ramirez-Hernandez,et al. A Case Study in Scheduling Reentrant Manufacturing Lines: Optimal and Simulation-Based Approaches , 2005, Proceedings of the 44th IEEE Conference on Decision and Control.
[20] J. Ben Atkinson,et al. An Introduction to Queueing Networks , 1988 .
[21] John N. Tsitsiklis,et al. The Complexity of Optimal Queuing Network Control , 1999, Math. Oper. Res..
[22] S.C.H. Lu,et al. Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants , 1994 .
[23] Dimitri P. Bertsekas,et al. Dynamic Programming and Optimal Control, Two Volume Set , 1995 .
[24] M. Venables. Small is beautiful [small, low volume semiconductor manufacturing plants] , 2005 .
[25] Mauricio G. C. Resende,et al. Closed-loop job release control for VLSI circuit manufacturing , 1988 .
[26] Richard S. Sutton,et al. Reinforcement Learning: An Introduction , 1998, IEEE Trans. Neural Networks.
[27] Roland Sturm,et al. Simulation-based evaluation of the ramp-up behavior of waferfabs , 2003, Advanced Semiconductor Manufacturing Conference and Workshop, 2003 IEEEI/SEMI.