Evaluating the Impact of Macroeconomic Policy Interventions and Recession on a Sewage Treatment PPP Project Using a System Dynamic Model

The revenue of a public-private partnership (PPP) project is influenced by macroeconomic scenarios such as economic recession and policy adjustments. But these macrofactors and their dynamic relations with microfactors in PPP projects have not been thoroughly understood. In this article, system dynamics (SD) and real option (RO) are integrated to develop a novel model to investigate the impacts of the macro-risk factors on the revenue of PPP projects. Five scenarios were studied through simulation. The results indicate that the loan interest rate and tax rate are negatively correlated to the revenue, while the GDP growth rate and self-owned capital rate are positively correlated. This indicates that the government can stimulate the private sector to invest in PPP projects by providing lower loan interest and increasing the self-owned capital rate. This integrated approach has been proposed for use by decision-makers to evaluate the impact of economics and policies in the future. This study provides a comprehensive review and reliable theoretical analysis regarding the adoption of PPP by China’s local governments, yielding to main policy implications for further promoting the efficiency of PPP development.

[1]  Yilin Yin,et al.  Fuzzy Synthetic Evaluation of the Critical Success Factors for the Sustainability of Public Private Partnership Projects in China , 2021 .

[2]  J. Tamošaitienė,et al.  Assessing the Barriers and Risks to Private Sector Participation in Infrastructure Construction Projects in Developing Countries of Middle East , 2020, Sustainability.

[3]  Hui Zhao,et al.  Constructing a Risk-Sharing Framework for Sponge City PPP Projects from the Perspective of the Individual Participant , 2020, Advances in Civil Engineering.

[4]  E. Kissi,et al.  Review of Exogenous Economic Indicators Influencing Construction Industry , 2019 .

[5]  Dagmawi Mulugeta Degefu,et al.  Effects of Short-Term Uncertainties on the Revenue Estimation of PPP Sewage Treatment Projects , 2019, Water.

[6]  Raden Murwantara Soecipto,et al.  Cost performance of transport infrastructure projects before and after the global financial crisis (GFC): Are differences observed in the conditions of project performance? , 2019, Research in Transportation Economics.

[7]  H. Mumtaz,et al.  The State-Level Impact of Uncertainty Shocks , 2018, Journal of Money, Credit and Banking.

[8]  S. Gundes,et al.  Optimized real options-based approach for government guarantees in PPP toll road projects , 2018 .

[9]  R. Long,et al.  Suggestion on tax policy for promoting the PPP projects of charging infrastructure in China , 2018 .

[10]  Ales Berk,et al.  Superiority of Monte Carlo simulation in valuing real options within public–private partnerships , 2018 .

[11]  Ruyin Long,et al.  Application of the public–private partnership model to urban sewage treatment , 2017 .

[12]  Albert P. C. Chan,et al.  Evaluation and ranking of risk factors in public-private partnership water supply projects in developing countries using fuzzy synthetic evaluation approach , 2015, Expert Syst. Appl..

[13]  N. Carbonara,et al.  Revenue guarantee in public-private partnerships: a fair risk allocation model , 2014 .

[14]  Francesca Medda,et al.  Public private partnerships in transportation: Some insights from the European experience , 2013 .

[15]  Oleksandr Talavera,et al.  Macroeconomic uncertainty and bank lending: The case of Ukraine , 2012 .

[16]  John F. Y. Yeung,et al.  System Dynamics (SD) -based concession pricing model for PPP highway projects , 2012 .

[17]  Patrick T.I. Lam,et al.  Preferred risk allocation in Chinas publicprivate partnership (PPP) projects , 2010 .

[18]  Valentín Azofra-Palenzuela,et al.  Real option value and random jumps: application of a simulation model , 2009 .

[19]  Izabela Karpowicz,et al.  The Effects of the Financial Crisis on Public-Private Partnerships , 2009, SSRN Electronic Journal.

[20]  L. E. Brandão,et al.  The option value of government guarantees in infrastructure projects , 2008 .

[21]  S. Thomas Ng,et al.  A fuzzy simulation model for evaluating the concession items of public-private partnerships schemes , 2007 .

[22]  N. Bloom The Impact of Uncertainty Shocks , 2007 .

[23]  W. Semmler,et al.  Asset price volatility and monetary policy rules: A dynamic model and empirical evidence , 2007 .

[24]  Maria Elena Bontempi,et al.  Why Demand Uncertainty Curbs Investment: Evidence from a Panel of Italian Manufacturing Firms , 2007 .

[25]  N. Bloom,et al.  Uncertainty and Investment Dynamics , 2006 .

[26]  A. Akintoye,et al.  Critical success factors for PPP/PFI projects in the UK construction industry , 2005 .

[27]  Li yin Shen,et al.  Risk Concession Model for Build/Operate/Transfer Contract Projects , 2005 .

[28]  Andreas Wibowo,et al.  Valuing guarantees in a BOT infrastructure project , 2004 .

[29]  M. Lilley,et al.  A Private-Sector Perspective , 2004 .

[30]  A. P. Papadopoulos,et al.  A monetary analysis of the Drachma/ECU exchange rate determination, 1980–1991 , 2000 .

[31]  Peter E.D. Love,et al.  Modelling the dynamics of design error induced rework in construction , 2000 .

[32]  Esther Malini,et al.  BUILD OPERATE TRANSFER MUNICIPAL BRIDGE PROJECTS IN INDIA , 1999 .

[33]  A. H. Hallett,et al.  The Impact of Exchange Rate Uncertainty on the Level of Investment , 1999 .

[34]  J. Rogers,et al.  Inflation and the Great Ratios: Long-Term Evidence from the U.S. , 1998 .

[35]  Yaman Barlas,et al.  Formal aspects of model validity and validation in system dynamics , 1996 .

[36]  John B. Taylor The Monetary Transmission Mechanism: An Empirical Framework , 1995 .

[37]  Roger F. Naill,et al.  A System Dynamics Model for National Energy Policy Planning , 1992 .

[38]  E. Prescott,et al.  Investment Under Uncertainty , 1971 .

[39]  J. Forrester Counterintuitive behavior of social systems , 1971 .

[40]  S. Mane Risk Assessment of Bot Projects , 2013 .

[41]  Kyung Hwan Yoon,et al.  Energy price uncertainty, energy intensity and firm investment , 2011 .

[42]  Zhong Gen-yuan,et al.  A Dynamic Fuzzy Evaluation Method of Project Financing Risk on Large Scale Infrastructure , 2004 .

[43]  C. X. Hu,et al.  Leverage, monetary policy, and firm investment , 1999 .

[44]  W. W. Crouch Finance and taxation , 1954 .