Production scheduling by reachability analysis - a case study
暂无分享,去创建一个
Gerd Behrmann | Martijn Hendriks | Angelika Mader | Ed Brinksma | G. Behrmann | E. Brinksma | M. Hendriks | A. Mader
[1] Holger Hermanns,et al. Synthesis and stochastic assessment of schedules for lacquer production , 2004, First International Conference on the Quantitative Evaluation of Systems, 2004. QEST 2004. Proceedings..
[2] Rajeev Alur,et al. A Theory of Timed Automata , 1994, Theor. Comput. Sci..
[3] Ansgar Fehnker,et al. Scheduling a steel plant with timed automata , 1999, Proceedings Sixth International Conference on Real-Time Computing Systems and Applications. RTCSA'99 (Cat. No.PR00306).
[4] Joseph Sifakis,et al. On the Synthesis of Discrete Controllers for Timed Systems (An Extended Abstract) , 1995, STACS.
[5] Michael Pinedo,et al. Scheduling: Theory, Algorithms, and Systems , 1994 .
[6] Kim G. Larsen,et al. As Cheap as Possible: Efficient Cost-Optimal Reachability for Priced Timed Automata , 2001, CAV.
[7] Oded Maler,et al. Job-Shop Scheduling Using Timed Automata , 2001, CAV.
[8] Wang Yi,et al. Uppaal in a nutshell , 1997, International Journal on Software Tools for Technology Transfer.
[9] Oded Maler,et al. Task graph scheduling using timed automata , 2003, Proceedings International Parallel and Distributed Processing Symposium.
[10] Angelika Mader. Deriving schedules for a smart card personalisation system , 2004 .
[11] Sergio Yovine,et al. KRONOS: a verification tool for real-time systems , 1997, International Journal on Software Tools for Technology Transfer.